Similar Projects
Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Wilsall, MT 59086

Town of Wibaux Wastewater Treatment System Upgrades Project
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Wibaux, MT 59353

Water Treatment Plant High Service Pump Station HVAC Upgrades
Renovation
Bidding
$200,000 CJ est. value
Billings, MT 59101

Mechanical Separation Units - Downtown Stormwater Treatment Phase 2 - STRM39 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Buena Vista Community Phase 2 Wastewater System Improvements
Renovation
Results
$580,000 est. value
Missoula, MT

Water Reclamation Facility Primary Digester Cleaning and Improvements
Renovation
Results
Billings, MT

Resurface and Repaint Clarifiers - WW39 - City of Bozeman
Renovation
Conception
$320,000 CJ est. value
Bozeman, MT 59718

Philipsburg Wastewater Treatment System Improvements Equipment
Renovation, Infrastructure
Post-Bid
$965,000 CJ est. value
Philipsburg, MT 59858

Water Treatment Plant Building Improvements
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Colstrip, MT 59323

Water Reclamation Facility Heat Exchangers
Renovation
Results
Billings, MT

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

BMP Pipe Maintenance Construction Project
Renovation, Alteration
Post-Bid
MT 59901

Downtown Stormwater Treatment Phase 4 - STRH02 - City of Bozeman
Renovation
Conception
$250,000 CJ est. value
Bozeman, MT 59715

Wastewater Treatment System Upgrades
Renovation
Post-Bid
$700,000 est. value
Terry, MT 59349

Last Updated 08/04/2022 12:01 AM
Project Title

Downtown Stormwater Treatment Phase 3 - STRH01 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59715   (Gallatin County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the installation of three (3) stormwater mechanical separation units near the following intersections: N. Rouse and E. Peach, N. Tracy and W. Main, and Langhor and Westridge. Staff proposes to target these locations because the roads, parking lots, yards, driveways, and drainage systems contained within their urban watersheds have a direct connection to Bozeman and Matthew Bird Creeks, meaning no removal of stormwater pollutants currently occurs. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of November 23, 2021, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents