Similar Projects
Condenser Replacement and Relocation - River Woods - Naperville Community Unit School District 203
Renovation
Conception
$250,000 CJ est. value
Naperville, IL 60565

Condenser Replacement and Relocation - Meadow Glens - Naperville Community Unit School District 203
Renovation
Conception
$250,000 CJ est. value
Naperville, IL 60565

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Roofing Work
Renovation
Design
$600,000 CJ est. value
Addison, IL 60101

Early Childhood Center
Renovation, Addition
Post-Bid
Villa Park, IL 60181

New Early Childhood Center Bid Release 3
Renovation, Addition - 100,400 SF
Post-Bid
Lombard, Villa Park, IL 60181

Jefferson Elementary School
Renovation, Addition - 2,500 SF
Results
Elmhurst, IL 60126

Field Elementary School
New Construction - 82,000 SF
Results
$10,000,000 CJ est. value
Elmhurst, IL 60126

Fischer ES Equipment Pre-Purchase
Addition, Alteration - 5,000 SF
Post-Bid
Elmhurst, IL

205 Fischer Elementary School
Renovation, Addition - 5,000 SF
Results
Elmhurst, IL 60126

Outdoor Classrooms and Media Center - Bid Release 1
New Construction, Renovation - 20,800 SF
Post-Bid
Itasca, IL 60143

Boiler Replacement at Multiple Schools
Alteration
Results
$35,000 to $45,000 est. value
Bartlett, Elgin, Streamwood, Wayne, IL 60120

Stevenson ES Early Childhood Center
Renovation, Addition
Post-Bid
Lombard, IL 60148

2022 Playground Renovations at Lincoln ES and Johnson ES
Renovation
Results
Warrenville, Wheaton, IL 60189

Pre K Addition at Raymond Benson Primary School
Addition
Post-Bid
Itasca, IL

Last Updated 03/15/2023 02:34 PM
Project Title

Steeple Run Elementary School Addition and Renovation Bid Package 24 - Structured Cabling System and Audio/visual Installation

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Bids by Invitation, Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Naperville Community Unit School District 203 ("District") encompasses approximately 32 square miles of land. The district is located about 28 miles west of Chicago and within DuPage and Will Counties. Its boundaries encompass much of the City of Naperville, parts of the Village of Lisle and single subdivisions lying within the communities of Bolingbrook and Woodridge. In terms of student population size, District 203 is one of the six largest school systems in Illinois, with nearly 17,000 students and over 2,400 employees. The Buildings and Grounds Department maintains more than 2,000,000 square feet of space in 22 schools--an early childhood center, 14 kindergarten through grade five elementary schools, 5 sixth through eighth grade junior high (or middle) schools and 2 ninth through twelfth grade high schools. The competency and responsibility of the bidders will be considered in making awards. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to the Naperville Community Unit School District 203 in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a bid. A fully executed and compliant Bid Security must be included with the Bid Form. The Construction Manager for this project is Wight Construction Services, Inc. All questions concerning this project or those concerning bidding requirements should be directed to: Nick Sleboda at 630.442.4569 Questions must be received via email to nsleboda@wightco.com no later than 1:30 PM (CDT) Friday, March 3, 2023. Naperville Community Unit School District 203 reserves the right to reject any and all bids and to waive any informalities, technicalities and irregularities in the bidding. The undersigned agrees to begin construction work on October 15, 2022 and to complete all work required by the Contract Documents on or before August 10, 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents