Similar Projects
Heating Ventilation Air Conditioning Mitsubishi System Installation
Bidding
Frederick, MD 21701

Galvanized Pipe Replacement (RGH)
Bidding
Laurel, MD 20707

Frederick Duct Cleaning
Term Contract
Post-Bid
Less than $50,000 est. value
Frederick, MD 21701

Remove Existing Chillers at Building 322 and Tie Into the New Campus Chilled Water Loop
Post-Bid
Frederick, MD

Modify Roof Exhaust Stacks and Attic Exhaust Ductwork in Building 560
Results
Frederick, MD

Replacement of the Water Heaters in Frederick County
Results
Frederick, MD 21705

Replace Chemical Fume Hoods
Bidding
$250,000 to $500,000 est. value
Frederick, MD 21701

Tie-In Chiller Plant #2 Into The New Campus Chilled Water Loop
Post-Bid
Frederick, MD

Campus Steam and Condensate Lines
Results
Fort Detrick, MD

Talley Recreation Center HVAC Maintenance
Term Contract
Post-Bid
Frederick, MD 21701

Redundant Chiller, ATRF
Results
Frederick, MD 21701

Building 560 - Replace Air Compressors
Post-Bid
Frederick, MD

B1049 HVAC Upgrades
Results
Frederick, MD

Z--HVAC Repair Building 1422
Post-Bid
Fort Detrick, MD

HVAC Improvements at Lincoln, Carver and Catoctin Manor Apartments
Results
Frederick, MD 21701

Reported 10/23/2020 12:00 AM
Project Title

HVAC and Mechanical Equipment Preventative Maintenance and Repair Frederick Readiness Center

Physical Address View project details and contacts
City, State (County) Frederick, MD 21701   (Frederick County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide systematic checking, adjustment, cleaning, and routine services. This includes examination, lubrication, adjustment, cleaning, and calibration of parts including, but not limited to: belts, bearings, capacity and safety devices; checking valves, condensate pumps, coils, control transformers, control wiring, dampers, electrodes, all filters, fuses, environmental controls, fans, motors and motor starters, pressure controls, water jackets, fire chamber, burners, and all necessary maintenance required to keep the unit(s) in proper and continuous operation

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents