Similar Projects
CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Bidding
$25,000 to $100,000 est. value
Leadville, CO 80461

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Havana Street 30 Inch Water Line Renewal
Results
$2,250,000 to $3,000,000 est. value
Aurora, CO 80012

Aurora Reservoir Above Water 72-Inch Vault - 72" Valve
Post-Bid
Aurora, CO

2020 Water System Improvement Project
Results
$2,350,000 to $2,550,000 est. value
Aurora, CO 80012

J099--Evoqua Water System testing and Maintenance Services for SPS RMRVAMC - 554
Post-Bid
Aurora, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 08/04/2021 10:13 AM
Project Title

Zone 2 Tanks Isolation Valves Project

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $418,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes installing two (2) 30-inch butterfly valves at the Districts Zone 2 Tank site. The valves are to be installed on the existing tanks inlet/outlet 30-inch pipes and will include pre-cast manhole vaults for the valve operators. Installation of two (2) temporary line stop plugs on the live 30 and 36-inch pipes are required to install the new valves.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents