Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Zilker Water and Wastewater Pipeline Renewal: Treadwell St. Area REBID
Infrastructure
Bidding
$8,600,000 CJ est. value
Austin, TX 78701

Barton Skyway Ramp Relief Construction Project
Infrastructure
Bidding
$6,100,000 CJ est. value
Austin, TX 78746

IH0010 - Cleaning and Sealing Cracks
Infrastructure
Sub-Bidding
$158,438 CJ est. value
Turtle Bayou, TX 77597

Install Traffic Signal
Infrastructure
Sub-Bidding
$2,289,114 CJ est. value
Austin, TX 78744

Parmer Village Multi-Family Apartment - Building 1 and Sitework
New Construction
Post-Bid
Austin, TX 78753

Vine Creek Subdivision Improvements - Phases 6 and 7
Renovation
Post-Bid
Pflugerville, TX 78660

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

Burnet Road Office Building
New Construction, Infrastructure - 180,000 SF
Construction
$28,088,000 CJ est. value
Austin, TX 78756

QuikTrip #4190 / Manor
New Construction, Infrastructure - 4,993 SF
Pending Verification
$475,000 CJ est. value
Manor, TX 78653

5th and Walsh-Shell Office Building
New Construction, Infrastructure - 204,000 SF
Pending Verification
$60,996,099 CJ est. value
Austin, TX 78703

Last Updated 08/10/2022 04:36 PM
Project Title

Onion Creek Odor Control Facility Stream Bank Stabilization - 6943.050 - City of Austin

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $521,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Evaluation and corrective action to address ongoing headcut and sheet erosion damage to protect against future erosion at the Onion Creek Odor Control Facility site. As of August 10, 2022, this project is currently in the FY 2022-2026 CIP. Bids will advertise September 2022. Construction is scheduled to begin Winter 2022/2023 and be completed Fall 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents