Similar Projects
SS 502 - Bicycle and Pedestrian Improvements
Infrastructure
Bidding
$260,728 est. value
TX

CSP for Extension of Post Oak Drive
Infrastructure
Bidding
Fredericksburg, TX

Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

P32 Parking Lot
Post-Bid
Stephenville, TX

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Elizabeth Avenue Realignment Project
Results
Less than $1,245,265 est. value
New Braunfels, TX 78130

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

Reconstruction of Pedestrian Sidewalks in the Manchester Area for Harris County Precinct 2
Results
Houston, TX

Campus Sidewalks and Road Repairs
Infrastructure
Post-Bid
Gainesville, TX

Central Business District Phase IV
Results
$13,500,000 to $14,500,000 est. value
El Paso, TX 79821

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Southcross Blvd (I-37 to I-35)
Results
$2,520,000 est. value
San Antonio, TX 78200

Shadow Creek Ranch Sidewalk Extension Project
Infrastructure
Post-Bid
Pearland, TX

Pedestrian Traffic Rail
Results
Less than $60,650 est. value
College Station, TX

Construction of Sugar Land - Howell at Wkbid Trail Connection
Infrastructure
Post-Bid
Richmond, TX

Last Updated 04/21/2022 01:35 AM
Project Title

Raymond Mays Middle School Safe Routes to School

Physical Address View project details and contacts
City, State (County) Troy, TX 76579   (Bell County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $154,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 690 SY of concrete sidewalk and ramps, combined; approximately 4 small road sign assemblies; approximately 755 SY of topsoil and sod including vegetative watering; and approximately 70 LF of 24” TY II pavement markings for a pedestrian crosswalk.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Painted Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents