Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

O'Reilly Auto Parts (REBID) (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts (REBID) (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

CA FTBL Dumont Dunes (1), Dumont Dunes Road
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Last Updated 02/20/2024 09:50 AM
Project Title

Washington Street Class 2 Bicycle Route Project

Physical Address View project details and contacts
City, State (County) Colton, CA 92324   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Works consists of, but not limited to installation of traffic signage, pavement striping and markings per Plan No. 1358-1. Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price. The successful bidder will be required to furnish the City with a Performance Bond equal to 100% of the successful bid, and a Payment (Labor and Materials) Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by City to ensure his performance under the Contract. Question Deadline 02/06/2024 at 5:00 PM PT All questions must be submitted in writing to ictor Ortiz, P.E., City Engineer, via email: vortiz@coltonca.gov. No questions will be received after this time. A copy of the Davis-Bacon Federal Prevailing Wage, the date of which reflects the latest applicable modification at the time of this advertisement, is included in the Contract Documents & Specifications. Bidders shall be notified, via Addendum, of modifications, if any, which supersede that included herein, up until a minimum of ten (10) days prior to the actual Bid Opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents