Similar Projects
Level and Overlay of SR 548
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Hermanville, MS 39086

Grade, Drain, Base, Pave, and Signalization on the Hegwood Road and Lincoln Road (Phase 1)
Infrastructure
Bidding
$500,000 est. value
West Hattiesburg, MS 39402

Annual Full Depth Reclamation
Post-Bid
Southaven, MS

2021 Overlay Petal
Post-Bid
Petal, MS

Mill and Overlay
Results
MS

Intersection Improvements at Various Locations Throughout the District 6
Infrastructure
Results
MS

2022 Warren County DBST Project
Infrastructure
Bidding
$200,000 est. value
Vicksburg, MS

Industrial Park Access Road Improvements
Post-Bid
Belmont, MS

Overlay Approximately 6.5 Miles on US 61 from the Warren County Line to the Sharkey County Line
Results
MS

Construction of the 2022 Roadway Improvements
Infrastructure
Bidding
$200,000 est. value
Morton, MS

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

County Wide Reseal 2022
Infrastructure
Bidding
$3,000,000 est. value
MS

Bay St. Louis Citywide Paving Project Phase 4 Asphalt Roads
Post-Bid
Bay Saint Louis, MS

Martin Bluff Road Widening and Reconstruction
Results
Gautier, MS 39553

Last Updated 06/17/2022 01:36 AM
Project Title

Mill and Overlay 11 Miles of SR 145

Physical Address View project details and contacts
City, State (County) Booneville, MS 38829   (Prentiss County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill & Overlay 11 miles of SR 145 from 1.3 miles south of the Lee County Line to the End of the 3-Lane Section, Mill & Overlay & Safety Improvements approximately 10.6 miles on SR 145 from the Lee County Line to the Beginning of 4-Lane Section South of Booneville, & approximately 3 miles of SR 145 from 0.5 miles north of SR 4 to US 45, known as Federal Project No. HSIP-9629- 00(004) / 109069301 in Prentiss County, State Project No. MP-1145-59(003) / 307770301 in Lee County & State Project No. MP1145-41(011) / 307770302 in Prentiss County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents