Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Design
$1,500,000 CJ est. value
Glasgow, KY 42141

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Pavement and Roadway Rehab
Infrastructure
Bidding
$400,000 CJ est. value
Park City, KY 42160

T-Hangar Site Grading
Infrastructure
Post-Bid
Glasgow, KY

Street Paving
Term Contract
Post-Bid
Glasgow, KY

Pavement (With Alternates). - Louie b Nunn Cumberland Parkway (Ln 9008) (Mp 0.000)
Infrastructure
Results
KY

Asphalt Pavement and Roadway Rehab (PW-9008)
Infrastructure
Results
KY

Span Tech
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of AC Pavement
Infrastructure
Conception
$4,000,000 CJ est. value
Glasgow, KY 42141

Parks - Barren River Irrigation Pond Replace Liner
Infrastructure
Post-Bid
$262,000 CJ est. value
Lucas, KY 42156

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

RFP D/B - Glasgow Parks and Recreation - Public Restroom for Gorin and Twyman Parks
New Construction, Infrastructure
Post-Bid
$220,000 CJ est. value
Glasgow, KY 42141

CS 1201 - Grade and Drain With Asphalt Surface
Infrastructure
Results
KY

Last Updated 02/10/2023 03:10 AM
Project Title

Address Pavement Condition of Louie B. Nunn Cumberland Parkway

Physical Address View project details and contacts
City, State (County) Glasgow, KY 42141   (Barren County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address Pavement Condition of Louie B. Nunn Cumberland Parkway Both Direction(S) From Milepoint 9.375 to Milepoint 14.85 Milepoints: From MP 9.375 To 14.850 Purpose and Need: Am-pavement (Pky)(P) As of February 10, 2023, the project is in Conceptual status. Anticipated Letting Year is 2023. KYTC - Address Pavement Condition of Louie B. Nunn Cumberland Parkway *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents