Similar Projects
Vicinia
New Construction
Conception
San Antonio, TX 78251

StayApt Suites
New Construction
Conception
Brownsville, TX 78526

Urbana at Juniper Pointe
New Construction
Design
San Antonio, TX 78253

Villita Tower Mixed Use Development
New Construction - 4,600 SF
Design
$89,000,000 est. value
San Antonio, TX 78205

Foundation Stabilization for Mission Park and Alazan Apartments
Infrastructure
Bidding
$50,000 CJ est. value
San Antonio, TX 78214

Pavilion Culebra Apartments
New Construction, Infrastructure - 251,431 SF
Sub-Bidding
$70,000,000 CJ est. value
San Antonio, TX 78228

Hawn Hotel, Arcadia Theater and Sears Building Redevelopment
Renovation - 85,000 SF
Post-Bid
Temple, TX 76501

Hycohen Apartments
New Construction - 1,791,244 SF
Post-Bid
$15,000,000 to $16,000,000 est. value
Houston, TX

Mission Del Lago Unit 11D (T.I.F.)
Results
San Antonio, TX 78200

Crescent Hills Unit 1 (T.R.I.Z.)
Results
San Antonio, TX 78200

Stacy Green
New Construction
Construction
Allen, TX 75013

Stacy Pointe Apartments
New Construction
Construction
$40,000,000 est. value
Allen, TX 75013

Escala Ranch Apartments
New Construction - 309,509 SF
Pending Verification
$50,000,000 est. value
San Antonio, TX 78251

Katherine Court Apartment Complex
New Construction
Pending Verification
Alamo Heights, TX 78209

Hunters Ranch Subdivision - Phase 3
New Construction
Conception
$2,500,000 est. value
San Antonio, TX 78275

Last Updated 12/01/2022 12:06 PM
Project Title

Scattered Site Units Rehabilitation Re-Bid

Physical Address View project details and contacts
City, State (County) Stanton, TX 79782   (Martin County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $696,484 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: New kitchens and bathrooms for the scattered site units. Work to include patching and painting of drywall and doors. The units to receive new flooring, new light fixtures, new receptacles and switches along with new cover plates, and replacement of doors, under slab plumbing repairs, and termite damage repairs. The Contractor shall visit the site and acquaint themselves with all existing conditions as they affect the work specified. All questions concerning this project shall be referred to 1919 Architects 4000 Morsay Drive, Rockford, IL 61107, (815) 229-8222, attention Ron Billy or ron@1919architects.com New kitchens and bathrooms for the scattered site units. Work to include patching and painting of drywall and doors. The units to receive new flooring, new light fixtures, new receptacles and switches along with new cover plates, and replacement of doors, under slab plumbing repairs, and termite damage repairs. Bids received must be enclosed in a sealed envelope and clearly marked Scattered Site Units Rehab. Bid Bond executed by the bidder and acceptable sureties in an amount of not less than 5% of the base bid shall be submitted with each bid. Failure to submit an acceptable bid bond with the bid will result in the rejection of the bid. Attention is called to the provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages set forth in the bid documents. All Contractors who are awarded construction related contracts must document Affirmative Action to ensure Equal Opportunity in Employment. This documentation is subject to review by the Regional Office of the Department of Labour. As a part of normal contract administration, Stanton Housing Authority is responsible for determining the Contractor's compliance with the Equal Employment Opportunity Clause and Affirmative Action Requirements as well as the Contractor's performance in executing those requirements. All MBE/DBE/WBE Contractors, Subcontractors and Suppliers are encouraged to participate on Stanton Housing Authority projects. Stanton Housing Authority reserves the right to accept or reject any and all bids and to waive any and all technicalities. No bid shall be withdrawn for a period of (90) calendar days subsequent to the opening of the bids without the written consent of Stanton Housing Authority.

Details

55,474 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents