Similar Projects
Juniper Street Storm Sewer and Water Main Replacement
Results
Quakertown, PA 18951

2020 Water System Improvements Project - Phase 2
Results
$2,000,000 est. value
Warminster, PA 18974

West Broad Street Water Main Replacement Project
Results
Less than $360,000 est. value
Telford, PA 18969

Cherry Blossom Drive Watermain Extension
Results
$250,000 est. value
Richboro, PA 18954

Village Park Water Quality Improvements Project
Results
Levittown, PA 19058

Water Main Improvements Project - Upper and Lower Barness Roads
Results
Warrington, PA 18976

Moland House Water Main Extension
Results
Less than $408,364 est. value
Warminster, PA 18974

Water Service Installation - Contractor Services
Term Contract
Results
Warminster, PA

Central System Water Main Extensions
Results
$116,000 to $119,000 est. value
Doylestown, PA 18901

Grove and Banks Street Water Main Replacement
Results
$175,000 to $200,000 est. value
Morrisville, PA 19067

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2021 Infrastructure Improvement Project Group
Results
Lansdale, PA 19446

Butler Avenue Water Man Extension
Infrastructure
Results
$750,000 to $800,000 est. value
Doylestown, PA

Pressure Reducing Valve Vaults
Results
Sellersville, PA 18944

2020 Water System Improvements Project
Results
Less than $1,800,000 est. value
Ivyland, Warminster, PA 18974

Last Updated 08/03/2021 12:50 PM
Project Title

North Main Street Water Main Project

Physical Address View project details and contacts
City, State (County) Doylestown, PA 18901   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $135,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally includes the construction of approximately 550 linear feet of 6-inch ductile iron pipe, 1 fire hydrant assembly and water main appurtenances. Construction will occur in Borough rights-of-way and easement areas and will involve restoration of roadway, driveways, parking lot and lawn areas and provisions for all necessary erosion and sedimentation controls.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents