Similar Projects
Repair Aircraft Sun Shades
Bidding
Eastover, SC

SC State House-Refinish Marble Floors
Bidding
$450,000 to $550,000 est. value
Columbia, SC 29201

Bates West Flooring Replacement Project
Post-Bid
$425,000 to $475,000 est. value
Columbia, SC 29208

Calhoun Building - Repair Parapets to Mitigate Water Infiltration
Post-Bid
$225,000 to $270,000 est. value
Columbia, SC 29201

Turn-Key Carpet Tile Replacement
Results
Columbia, SC

Carpet Installation and Painting
Results
Columbia, SC

Awning Installations
Term Contract
Bidding
$50,000 est. value
Blythewood, SC 29016

Carpet and Flooring Products and Services
Term Contract
Post-Bid

Enclose the Existing Shed at Wateree Heritage Preserve
Results
Eastover, SC

Metal Handrail Addition and Repair/Replacement
Bidding
Columbia, SC 29250

Jarret Building - Window Sill/Building Envelope Waterproofing
Post-Bid
$175,000 to $190,000 est. value
Columbia, SC 29201

Blossom Street Parking Garage East Stair Replacement
Results
$150,000 to $250,000 est. value
Columbia, SC

Gym Floor Refinishing and Repainting
Bidding
Columbia, SC 29212

New Flooring 1st Floor Jefferson Square
Post-Bid
Columbia, SC 29201

78--Artificial Turf
Results
Columbia, SC 29207

Last Updated 06/24/2019 08:33 AM
Project Title

Harbison State Forest Construction/Repairs Project

Physical Address View project details and contacts
City, State (County) Columbia, SC 29212   (Richland County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Building A 1. Remove all existing deck flooring, step flooring, ramp flooring, and handrail. (Approximately 1860 sq. ft.) 2. Provide labor to install new treated lumber flooring and handrail system. Handrail to be installed in same style as existing handrail. Owner to furnish material 1. Contractor to furnish screws to install all material on deck 2. All new handrail posts to be 4"x 4" Building B and C 1. Remove damaged board and batten siding. ( damaged boards have been marked with orange paint) 2 Replace with 3/4" Rough Sawn cedar or cypress boards. Contractor to furnish material and fasteners Building A 1. Fasteners to be #10 x 3" Star Drive Stainless Steel Screws 2. Screws to be installed flush. DO NOT countersink screws 3.All flooring to be install with no gaps 4. All 4"x 4" posts to be installed with Stainless Steel lag screw with washers Building B and C 1. Siding to be 3/4" board and batten type siding 2. Material to be rough sawn cedar or cypress 3. Fasteners to be galvanized 2 1/2 "siding screw nails.
Details
Division 07 - Thermal and Moisture Protection, Siding.
Division 09 - Finishes, Flooring, Painting.
Division 10 - Specialties, Wall and Door Protection, Bumper Guards, Protective Corridor Handrails.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents