Similar Projects
Windle Lane Stormwater Pond
Post-Bid
Daytona Beach, FL 32100

Blue Springs (Bank Stabilization)
Post-Bid
$550,000 est. value
FL

Horizontal Directional Drilling Services
Results
Daytona Beach, FL 32720

FY 2019 Water Main Improvements
Results
Less than $1,400,000 est. value
De Land, FL 32720

Glencoe Farms Road Water Main Improvements and Spruce Street Water Main Replacement
Post-Bid
Less than $275,000 est. value
Glencoe, New Smyrna Beach, FL 32168

Roadway Repair
Results
Less than $350,000 est. value
FL

Furnish and Deliver PVC and HDPE Pipe for 2019 Water Main Improvements
Results
De Land, FL 32724

Fort Florida Road Utility Improvements
Results
Less than $1,200,000 est. value
De Land, FL 32720

Bethune Point Shoreline Stabilization
Results
$300,000 to $350,000 est. value
Daytona Beach, FL 32100

Drainage Repair
Results
Less than $400,000 est. value

Sweetwater Hills Drainage Improvements
Results
Less than $200,000 est. value
Port Orange, FL 32129

Reclaimed Water Main Extension Phase 4
Results
Less than $1,920,000 est. value
De Land, FL 32720

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

Tatum Boulevard to Elizabeth Street Water Main
Results
Less than $400,000 est. value
Edgewater, FL 32132

Furnish and Deliver PVC and HDPE Pipe for Reclaim Water Main Extension Phase 4
Results
De Land, FL 32720

Last Updated 02/17/2021 08:48 AM
Project Title

Howes Street and Orange Avenue Watermain and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Port Orange, FL 32127   (Volusia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of stormwater improvements in the area of Howes Street and Orange Avenue, including construction of 1,450 LF of 15 exfiltration trench, 580 LF of 18 exfiltration trench, 60 LF of 15 RCP, 500 LF of 18 RCP, 125 LF of 14 x 23 ERCP and fifteen (15) drainage structures, installation of 2,700 LF of C-900 6PVC Water Main with restrained joints, 200 LF of 8 HDPE Directional Drill Water Main, new water services, 3 fire hydrants, gate valves, tapping sleeves and fittings as shown on the plans. Restoration items include removal and replacement of driveways and sidewalks, sod restoration and asphalt milling and replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents