Similar Projects
Last Updated | 11/16/2020 01:52 PM |
Project Title | CTH T - CTH T, Mill Creek Bridge, B-25-0186 |
Physical Address | View project details and contacts |
City, State (County) | WI (Iowa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CTH H; 0.098 Miles; Excavation, Base, Asphaltic Surface, Beam Guard, Signs, and Structure B-25-186. Consist of removing old Structure P-25-0041, excavation, grading, base aggregate dense, asphaltic surface, Structure B-25-0186, MGS guardrail. Excavation Common, 516 CY; Borrow, 901 CY; Backfill Structure, 420 Ton; Base Aggregate Dense, 1,334 Ton; Concrete Masonry Bridges, 580 CY; Bar Steel Reinforcement, 12,040 Lbs; Bar Steel Reinforcement Coated, 97,980 Lbs; Piling CIP Concrete, 1,040 LF 10 3/4-Inch, 1,400 LF 12 3/4-Inch; Construction Staking, 1,059 LF; Construction Staking, 2 LS; Beam Guard, 157 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 297 Ton; Tack Coat, 93 Gals; Signs, 12 SF. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |