Similar Projects
Terminal Roof Replacement
Renovation
Sub-Bidding
$180,000 CJ est. value
Henderson, KY 42420

DMA London Roof Replacement
Renovation - 16,150 SF
Sub-Bidding
$600,000 CJ est. value
London, KY 40741

Erpenbeck Elementary School Roof
Post-Bid
Florence, KY 41042

Pike Central High School Roof Replacement
Post-Bid
Pikeville, KY

Partial Roof Replacement at Various Schools
Renovation
Results
Louisville, KY 40203

Partial Roof Replacement at Newcomer Academy
Results
Louisville, KY 40218

Toombs Court and Latimer Heights Roof Replacement
Renovation
Construction
$390,000 CJ est. value
Danville, KY 40422

DMA Hazard Roof Replacement
Renovation
Sub-Bidding
$650,000 CJ est. value
Hazard, KY 41701

Install a New Cedar Shake Roof
Post-Bid
KY

Partial Roof Replacement at Seneca High School
Results
Louisville, KY 40220

Carter County Maintenance Garage Roof Overlay
Post-Bid
$67,000 est. value
Carter, KY

Repair Roofing Buildings 1 and 1A
Results
$2,000,000 to $5,000,000 est. value
Lexington, KY 40502

Reroof Newport Intermediate School
Post-Bid
Less than $420,110 est. value
Newport, KY 41071

Matheson LRC Building Roof Replacement
Results
Less than $678,000 est. value
Paducah, KY 42001

Somersplash Roof Repair
Post-Bid
Somerset, KY 42503

Last Updated 09/14/2022 05:03 PM
Project Title

Kentucky Correctional Industries Frankfort Roof Replacement

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $583,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

1. New PVC roofing membrane & "flute filler" rigid insulation installed over existing metal panel roof system for roof areas A & B only. a. Clean roof surfaces b. Replace translucent fiberglass roof panels (Roof B) with metal roof panels to match existing. c. Loose lay rigid Isocyanurate insulation between roof panel ribs d. Loose lay cover board insulation over entire roof e. Mechanically fasten both layers of insulation to existing metal roof structure. f. Mechanically fasten .060 PVC membrane roof over insulation. g. Install all PVC flashings and metal components to complete the installation. h. Install new framework, pre-finished metal wall & soffit panels @ front facade & tower. Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents