Similar Projects
Purchase of 12 Centrifugal Pumps for the Jefferson Parish Department of Drainage
Infrastructure
Bidding
Gretna, LA

Sump Pumps
Alteration
Bidding
Baton Rouge, LA

FLYGT Pump
Infrastructure
Post-Bid
Slidell, LA

Purchase of Chopper Pumps
Infrastructure
Post-Bid
Gretna, LA

Chiller Pumps Replacement at the Municipal Auditorium
Infrastructure
Results
$38,500 est. value
Shreveport, LA

Removal of Existing Vacuum Pumps and Furnish, Install and Startup of New Vacuum Pumps
Infrastructure
Results
Marrero, LA 70072

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Vertical Turbine Solids Handling (VTSH) Pump and Motor
Infrastructure
Results
Gretna, LA

8-Inch Portable Water Pump
Infrastructure
Post-Bid
Convent, LA

Controller Pumps for Jefferson Parish Public Works Warehouse
Infrastructure
Results
Gretna, LA

171 Tsurumi Pumps
Infrastructure
Post-Bid
Hahnville, LA

FY 2020 LCDBG Water System Improvements - Contract No. 2 - Mississippi Street Water Well
Infrastructure
Results
$1,285,000 est. value
Baker, LA

131 - Repair and/or Installation of Pumps and Related Equipment and Plant Maintenance
Infrastructure
Post-Bid
Hahnville, LA

LA 182 University PS Pump 2 Motor Rehabilation
Infrastructure
Results
$50,000 est. value
LA

122 - Submersible Flygt Pumps
Infrastructure
Post-Bid
Hahnville, LA

Last Updated 09/10/2021 02:01 PM
Project Title

George H. West Water Treatment Plant Wells G-8 and G-9 Starter Replacements

Physical Address View project details and contacts
City, State (County) Lake Charles, LA   (Calcasieu County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Work shall include: Removal and Disposal of Existing, Defective Starter Cabinets, Installation of Pad-Mounted 2,300V to 480V Transformer, Installation of Main Service Disconnect (per Entergy requirements), Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts, Installation of Service Disconnect for Each Starter (TYP of 2), Removal and Replacement of 150HP Well Motors (TYP of 2), Termination of Electrical Connections into Existing Plant Service/Controls

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents