Similar Projects
2021 Road Paving
Post-Bid
Chilton, WI

2022 Irish Road / Geiser Way / T.I.D. 6 Construction
Infrastructure
Post-Bid
$1,375,000 est. value
Chilton, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Paving Program
Results
WI 54915

Wedging and Sealing
Infrastructure
Post-Bid
$240,000 est. value
Potter, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Hot Mix Asphalt on Various Roads
Infrastructure
Post-Bid
$300,000 est. value
New Holstein, WI

2021 Pavement Improvements
Results
$64,000 est. value
New Holstein, WI

Wedging and Seal Coating
Infrastructure
Post-Bid
$200,000 est. value
WI

Chilton Court Street and Madison Street/Breed Street Concrete Pavement
Results
Chilton, WI 53014

Road Work
Infrastructure
Post-Bid
$400,000 est. value
Chilton, WI

2021 Street and Utility Improvements
Results
$225,000 est. value
Hilbert, WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

2021 Quality Drive Utility and Street Construction
Infrastructure
Results
New Holstein, WI

Sequoia Drive Sewer, Water, and Grade and Gravel
Infrastructure
Results
Appleton, WI

Last Updated 07/21/2022 12:44 AM
Project Title

Seal Coating, Wedging and Patching of Town Roads and Reconstruction of Sharon Street in St John

Physical Address View project details and contacts
City, State (County) Hilbert, WI 54129   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seal coating, wedging and patching of Town roads and reconstruction of Sharon Street in St John. Specify the type of liquid asphalt, the gallons to be used, the type of cover aggregate to be used, and the tons or cubic yards of aggregate to be used per mile of 22 foot roadway. Indicate the total price per mile of 22 foot roadway for oil, aggregate, labor, and equipment for seal coating.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents