Similar Projects
Byrd Park Reservoir Rehabilitation
Alteration
Bidding
Richmond, VA 23219

Dickinson Building Partial Roof Replacement Project
Renovation, Alteration - 6,500 SF
Bidding
Charlottesville, VA 22902

Cassell Roof Repair
Post-Bid
Blacksburg, VA 24061

Roof Replacement Project at Grove Park Preschool
Post-Bid
Danville, VA

Kempsville High School Roof Replacement and Partial HVAC Replacement
Results
Virginia Beach, VA 23464

Pentagon RDF Roof Repair - PHASE 2
Results
$10,000,000 to $25,000,000 est. value
Washington, DC - Arlington, VA 20301

844 Pine Street Roof and Gutters Repair
Alteration
Bidding
Danville, VA 24541

Roof Removal/Replacement
Post-Bid
Warrenton, VA

M.M. Pierce ES Shingle Roof
Results
$111,672 est. value
Remington, VA

Nike Park - Facility Maintenance Building Roofing
Alteration
Bidding
Carrollton, Isle of Wight, VA 23314

Partial Roof Replacement Prince Edward Courthouse
Post-Bid
Farmville, VA 23901

Farmington Elementary School Roof Replacement
Results
Culpeper, VA 22701

Crittenton Hall Re-Roof
Post-Bid
Norfolk, VA 23529

Trani Roof Repair and HVAC Replacement
Results
Richmond, VA 23220

Columbarium Vertical Repairs Courts 7-9 Arlington National Cemetery
Post-Bid
Arlington, VA

Reported 07/15/2021 12:00 AM
Project Title

Walker Trailer Roof Repair

Physical Address View project details and contacts
City, State (County) Charlottesville, VA 22903   (Albemarle County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified vendors to supply all labor, equipment, and materials to install a new EPDM roof over the existing Metal roof on the modular units behind Walker Upper Elementary School. Roof size roughly 56’ 4” X 31’ 1”, 1,751 Square feet. Perform pre-construction meeting to discuss set up, staging area for equipment and loading of the roof, appropriate work hours, safety and production projections. Attach approximately 60 sheets of ½” HD board will be mechanically fastened to existing metal roof. Install a new fully adhered 45 mil EPDM membrane roof system. Provide all flashings and terminations for all transitions, and perimeters. Install new shop fabricated 24 ga. Kynar prefinished metal flashing where necessary. Terminate and flash around (12) vents according to manufacturer’s specifications. Remove and dispose of all job-related debris.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents