Similar Projects
PetSuites of America
Renovation - 14,000 SF
Conception
Sanford, FL

Dolphins Plus Marine Mammal Responder Necropsy Lab
New Construction
Conception
Key West, FL

Brevard Zoo Aquarium at Port Canaveral
New Construction - 130,000 SF
Design
$70,000,000 est. value
Cape Canaveral, FL 32920

Suncoast Humane Society
New Construction - 25,203 SF
Design
$9,000,000 est. value
Englewood, FL 34224

Y--Replace 3 Chickees and Echo Pond Deck
Renovation
Post-Bid
Homestead, FL

CMAR for Domestic Animal Services New Facilities
New Construction - 25,000 SF
Post-Bid
$6,000,000 est. value
FL

Animal Services Facility Surgical Suite
Renovation - 1,175 SF
Results
Milton, FL 32583

Black and Indian Rhino Barn Renovation
Renovation
Results
Less than $1,200,000 est. value
Miami, FL 33177

Icebox Cafe and Culinary Center
New Construction - 14,100 SF
Construction
$1,800,000 est. value
Hallandale, FL 33009

Country Inn Pet Resort
Addition - 5,252 SF
Construction
$1,600,000 est. value
Davie, FL 33325

Elephant Habitat
New Construction
Pending Verification
Yulee, FL

Tiki Tails Dog Resort
New Construction - 7,000 SF
Conception
$300,000 est. value
Cape Coral, FL 33904

Mote Marine Laboratory and Aquarium
New Construction - 110,000 SF
Design
$130,000,000 est. value
Sarasota, FL 34240

Classic Caladiums Restrooms Renovation
Renovation
Post-Bid
Avon Park, FL 33825

Furnish and Install Greenhouses
Results
Lake Wales, Lakeland, FL 33813

Reported 02/13/2022 12:00 AM
Project Title

Construct Pest Management Facility

Physical Address View project details and contacts
City, State (County) Tyndall AFB, FL 32403   (Bay County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is being solicited as a Historically Underutilized Business Zone set aside. The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in this SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific construction effort for the Construction of the new Pest Management Facility located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions.

Details

Animal/Plant/Fish Facility, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents