Similar Projects
Princess Abigail Kawananakoa Center Repairs - Hawaii County
Renovation
Conception
$2,000,000 CJ est. value
Hawi, HI 96719

Wahiawa Civic Center
Renovation
Results
$10,000,000 est. value
Wahiawa, HI 96786

Waipahu Clubhouse New Air Conditioning System and Other Improvements
Renovation
Results
$724,000 CJ est. value
Waipahu, HI 96797

Kaneohe Civic Center Facility and Site Improvements
Renovation
Results
$2,500,000 to $3,000,000 est. value
Kaneohe, HI 96744

Ala Wai Small Boat Harbor - Department of Land and Natural Resources
New Construction, Infrastructure
Pending Verification
$361,000,000 CJ est. value
Honolulu, HI 96813

The Kamaole Grand
New Construction, Alteration
Design
$90,000,000 est. value
Kihei, HI 96753

Halau of Oiwi Arts - CBS-7251 - Maui County
New Construction, Infrastructure
Conception
$51,800,000 CJ est. value
Wailuku, HI 96793

Kihei Community Center Improvements - CBS-6644 - Maui County
Renovation
Conception
$600,000 CJ est. value
Kihei, HI 96753

Lanai Youth Center and Skate Park - CBS-6052 - Maui County
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Lanai City, HI 96763

Last Updated 04/28/2023 07:07 PM
Project Title

Anuenue Fisheries Research Center Hatchery Building Improvements

Physical Address View project details and contacts
City, State (County) Honolulu, HI 96819   (Honolulu County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A performance and payment bond in an amount equal to one hundred percent (100%) of the total Contract price. The work shall generally consist of in-kind removal and replacement of existing deteriorated portions of metal pre-fabricated framing, translucent corrugated roof panels, and existing shade cloth system, minor repairs to the existing metal gutter and flashing, grout at top of CMU stem wall, manual/motor-driven louver system, and cleaning/coating of exposed metal framing members. All rights reserved.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents