Similar Projects
RFP - Construction Management Services for Evergreen Lake North Trail Project
Term Contract
Bidding
Evergreen, CO 80439

RFP Engineering - Carmody Indoor Pool Design and Service Repairs
Renovation
Bidding
$75,000 CJ est. value
Lakewood, CO 80227

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Apex Archery Range - Professional Architectural Design Consulting Services
New Construction
Post-Bid
Arvada, CO 80005

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Replace Hazardous Laboratory Exhaust Fans, Coolbaugh Hall - Colorado School of Mines
Renovation
Pending Verification
$70,000 CJ est. value
Golden, CO 80401

RFQ Design - Denver Federal Center Building 15 Upgrades / IH22-143
Renovation
Bidding
$900,000 CJ est. value
Golden, CO 80401

Architect-Engineering Services to Support The Us. Air Force and AFECE Environmental Program Worldwide "AE ES 2022"
Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFP - Flood Mitigation Feasibility Study
Term Contract
Bidding
Arvada, CO 80002

Meyer'S Pool Replacement Project Architectural/Engineering Services
New Construction, Term Contract
Post-Bid
Arvada, CO 80005

Two Creeks Park Master Plan Update and Construction Documentation
Infrastructure
Results
Less than $200,000 est. value
Lakewood, CO 80214

RFQ Design - Architectural Engineering Consulting Services for CBI Forensic Laboratory Expansion and Renovating Existing Lab
Renovation
Bidding
$2,604,244 CJ est. value
Arvada, CO 80002

Library Design Consultant Services
New Construction, Infrastructure
Post-Bid
Lakewood, CO

Last Updated 07/13/2023 10:23 AM
Project Title

New Residence Hall VII - Colorado School of Mines

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $210,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 13, 2023, an architect has been selected and this project is in the design stage. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Addendum: 1 The Colorado School of Mines (Mines) is seeking firms for the programming of an 800-bed (apartment-style) residence hall, dining hall, and recreation and wellness facility on Mines Campus. Mines is also seeking A/E services through this RFQ process. Approximated construction cost is $210 million. The selection process for the CM/GC will begin following the selection of a firm for this solicitation, acting initially under a Consultant Contract with Mines for purposes of program planning. Upon successful completion of the Consultant Contract, Mines and consulting firm will enter into an A/E CM/GC Agreement for purposes of architectural services. Mines shall reserve the right to terminate the relationship with the consulting firm at any time if it is not in the best interests of Mines or the State of Colorado to continue with selected firm. Job Location Golden, Colorado Question Acceptance Deadline 07/20/2022 07:00 PM EDT Questions are submitted online No The method of Contractor Selection has not been Determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents