Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

Delaware Water Quality Project - 36107019 - El Dorado County
Infrastructure
Conception
$400,000 est. value
Pollock Pines, CA 95726

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

2022 Bijou 2/3 Waterline Replacement Project
Infrastructure
Results
$2,165,707 est. value
South Lake Tahoe, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

Asphalt Patch Paving
Term Contract
Post-Bid
Placerville, CA

Roadway Excavation and Install Concrete Drainage Inlet
Infrastructure
Results
$850,000 est. value
CA

Dutch Bros Coffee / Cameron Park
New Construction, Infrastructure - 950 SF
Pending Verification
$300,000 CJ est. value
Cameron Park, CA 95682

Last Updated 04/14/2023 10:02 PM
Project Title

2023 Forebay Road and Drop Off Road Waterline Replacement

Physical Address View project details and contacts
City, State (County) Placerville, CA 95667   (El Dorado County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,280,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of: replacing waterlines, pressure reducing stations, and metered services in the community of Pollock Pines on Forebay Road, Agra Street, Dobson Way, Eastwood Lane, Bandit Court, Elf Lane, Deep Haven Road, and Drop Off Road. Bidding Documents contain the full description of the Work. REQUIRED CONTRACTOR'S LICENSE(S). A California class A contractor's license is required to Bid this Contract. Joint ventures must secure a joint venture license prior to award of this Contract. Removal, handling, and/or disposal of hazardous materials may by law require hazardous substance removal certification by the Contractor's State License Board. BID PREPARATION COST. Bidders are solely responsible for the cost of preparing their Bids. RESERVATION OF RIGHTS. District specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-Bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents