Similar Projects
Waste to Energy Facility Demolition
Demolition
Bidding
$450,000 est. value
Panama City, FL 32404

Demolition of 3125 / 3127 Dora Street, 3023 / 3025 Willard Street, and 3011 Franklin Court
Demolition
Post-Bid
Fort Myers, FL 33916

Demolition of Existing Community Center and Construction of New 14,799 SF New Community Center
New Construction, Demolition - 14,799 SF
Post-Bid
Jupiter, FL 33469

Demolition of Facilities Phase 3
Demolition
Results
Panama City, FL 32403

Demolition IDIQ
Results
$5,000,000 to $25,000,000 est. value
Eglin AFB, FL 32542

The Falls - Bloomingdales Demo
Demolition
Construction
Kendall, FL 33176

First United Methodist Church Demolition / Including Environmental Abatement
Demolition
Construction
Port Saint Joe, FL 32456

Continuing Contracts for City-Generated Demolitions
Term Contract
Post-Bid
Fort Myers, FL

Canal Point Bldg Demo
Demolition - 1,324 SF
Results
Canal Point, FL 33438

Demo 103 Verona st S
Demolition
Post-Bid
$5,000 est. value
Nokomis, FL 34275

Ft. Pierce Screenroom Demo
Demolition
Results
Fort Pierce, FL 34945

Building 270 Demolition 2021
Demolition
Post-Bid
Bartow, FL

Hurlburt Field - Dormitory Demolition
Demolition
Results
Hurlburt Field, FL 32544

Demolition of Nine (9) Flood Prone Properties
Post-Bid
Jacksonville, FL 32207

Monroe County Historic Jail Demolition and Asbestos, Lead and Mold Abatement
Demolition
Results
Less than $202,500 est. value
Key West, FL 33040

Last Updated 02/24/2022 07:14 AM
Project Title

H. Spurgeon Cherry Pool Liner Replacement and Plumbing Repair

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32605   (Alachua County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the demolition and disposal of approximately 200 LF of 12”x 6” concrete perimeter curb around the H. Spurgeon Cherry pool to allow for the installation of a new stainless steel gutter system to replace the existing pool recirculation plumbing. Rebuild a new curb to match the existing one in order for the pool water and deck to be at the same level. The main supply and return pipes shall be pressure tested once the pool is empty and a new PVC pool liner installed to complete the work.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents