Similar Projects
Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement
Term Contract
Bidding
$93,000,000 est. value
Hill AFB, UT

Farmington Station Business Park
New Construction, Infrastructure
Bidding
$1,096,000 est. value
Farmington, UT 84025

Construction of the 1200 South Road Project
Post-Bid
Syracuse, UT

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Post-Bid
$450,000 est. value
Centerville, UT

Moenave Trail Improvements
Results

2000 West and 1300 North Intersection Clinton
Results
$500,000 to $1,500,000 est. value
UT

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

2022-2023 Street Maintenance
Infrastructure
Bidding
$1,600,000 est. value
Layton, UT

1970 South 1200 West Street Construction Project
Post-Bid
$1,100,000 est. value
Woods Cross, UT 84087

2021 Road Reconstruction Project
Results
West Bountiful, UT

2022 North Canyon Trailhead
Infrastructure
Bidding
$456,000 est. value
Bountiful, UT

Crack and Slurry Seal Project 2021
Post-Bid
$275,000 est. value
Centerville, UT

Layton Parkway - 2700 West Construction Project
Results
Less than $6,300,000 est. value
Layton, UT

Street Overlay Project 2021
Post-Bid
$250,000 est. value
Centerville, UT

Construction of The Foxboro Drive Street Reconstruction (Foxboro Elementary School to Fox Hollow Drive Roundabout)
Results
North Salt Lake, UT

Reported 07/07/2022 12:00 AM
Project Title

2600 West Street Widening

Physical Address View project details and contacts
City, State (County) Clinton, UT 84015   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Installation of concrete curb and gutter, sidewalk, driveway approaches, placement of asphalt pavement and sub-grade, and restoration of landscaping. 2600 West Clinton, UT. Est. Value:$ 600,000.00. The project includes the following work: Construction of asphalt pavement and sub-grade. Installation of concrete curb and gutter, sidewalk, and driveway approaches Restoration of landscaping Street utility work has already been completed

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents