Similar Projects
Pavement Rehabilitation - Detroit Lakes HQ
Infrastructure
Bidding
$72,000 est. value
Detroit Lakes, MN 56501

2022 Pavement Improvements
Infrastructure
Bidding
Pine City, MN

2021 Roads Maintenance
Renovation
Post-Bid
Red Wing, MN

2021 Seal Coats
Post-Bid
MN

Grading, Bituminous Mill and Overlay, Lighting, ADA Improvements
Results
MN

9101 FEMA County Road Repair
Results
MN

2022 19th Avenue South Improvements
Infrastructure
Bidding
Sartell, MN 56377

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Bituminous Reclamation and Paving
Results
Wabasha, MN

2022 Bituminous Sealcoat
Infrastructure
Bidding
$400,000 est. value
Princeton, MN

Stone House Timber Access Road Maintenance
Post-Bid
MN

METRO D Line BRT
Results
MN

4th Street Southeast and 10th Street Southwest Improvements - 2022
Infrastructure
Bidding
$310,000 est. value
Pipestone, MN

Gordon Bailey ES Pavement Rehabilitation
Post-Bid
Woodbury, MN 55129

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

Last Updated 04/20/2022 03:49 AM
Project Title

Mill and Overlay, Underseal

Physical Address View project details and contacts
City, State (County) Maynard, MN   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Locations: SAP 012-604-020: On CSAH 4 from South County Line to TH 7 SAP 012-616-010: On CSAH 16 from CSAH 15 to CSAH 5 The major items of work include: 4372 tons of Shoulder Base Aggregate Class 5 Mod, 177,915 SY of Mill Bituminous Surface (2”), 734 SY of Remove Bituminous Pavement, 489 CY of Excavation Special, 20,471 tons of Type SP 12.5 Wearing Course Material, 1,047 tons Type SP Bit Mixture for Patching, 227 tons of Type 4.5 Bituminous Mixture for Tight Blade Leveling, 824 feet of Bituminous Curb, 4,066 gallons Bituminous Material for Fog Seal, 40,660 SY Bituminous Seal Coat, 15858 gallons of Bituminous Material for Seal Coat, Adjust Gate Valve, Adjust Frame and Ring Casting, interm pavement markings, and traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents