Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Install Cured In Place Pipe Lining in Second Floor Sewer Piping, Federal Building/PO/CH
Infrastructure
Design
$100,000 CJ est. value
Pierre, SD 57501

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 SDDOT Airport Pavement Maintenance
Term Contract, Infrastructure
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Access Road Construction
Infrastructure
Results
SD

T.F. Riggs High School Athletics Addition - Pierre School District
Addition, Demolition, Infrastructure
Pending Verification
$9,300,000 CJ est. value
Pierre, SD 57501

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Asphalt Surface Treatment
Infrastructure
Results

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$4,711,000 CJ est. value
Harrold, SD 57536

RFP Design - Architectural and Engineering Services Grounds ,Stormwater,Water Line,Sewer
Infrastructure
Post-Bid
$3,200,000 CJ est. value
Pierre, SD 57501

Street Paving
Infrastructure
Results
Pierre, SD

Steamboat Park Development - City of Pierre
Infrastructure
Conception
$2,000,000 CJ est. value
Pierre, SD 57501

Last Updated 01/05/2023 10:03 AM
Project Title

Access Connection/Road Improvement - Cow Creek Recreation Area

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $275,952 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders may send sealed bids to the Department of Game, Fish and Parks Engineering Section, Foss Building, 523 East Capitol Ave., Pierre, SD 57501-3182. Bidders may drop off sealed bids at the Foss Building prior to the announced date and time of the Bid Opening. Technical questions can be forwarded to Scott Schweitzer, Brosz Engineering, Inc. at 605-224-1123 or via email to scotts@broszengineering.com. Each bid in excess of $100,000.00 must be accompanied by a certified check, cashier's check or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Department of Game, Fish and Parks of the State of South Dakota. Anyone requesting, reviewing, or copying plans and specifications for this project (such individual is hereinafter referred to as "bidder") agrees that they are doing so for the sole purpose of submitting a bid on the project. The South Dakota Department of Game, Fish and Parks reserves the right to reject any or all bids and to waive any irregularities therein. Tree Removal and Disposal Clearing and Grubbing and OffSite Disposal Remove and Replace Topsoil Unclassified Excavatio 18" RCP Furnish and Install 24" RCP Furnish and Install 30" RCP Furnish and Install 30" RCP Flared End Furnish and Install 24" RCP Flared End Furnish and Install Seeding, Mulching, and Fertilizing 1. Access Area Construction, including: o Site Clearing, including tree removal and clearing/grubbing o Earthwork, including Unclassified Excavation, Compacted Embankment, Contractor Furnished Borrow and Selective Topsoil Placement o Reinforced concrete pipe and flared end installations o Ordinary Shaping, Geotextile Reinforcement, and Base Course surfacing o Turf Restoration, including seeding, fertilizing, and mulching o Erosion and Sediment Control The completion date for the Project shall be June 1, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents