Similar Projects
Aubuchon Road Culvert Repair
Infrastructure
Bidding
MO

Culverts, Pipe and Bridge Materials
Infrastructure
Bidding
Lexington, MO

Forest Park Waterway
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

West Hangar Drainage Improvements
Post-Bid
Chesterfield, MO 63005

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

Storm Drainage Improvements Project Area 4A
Infrastructure
Bidding
Sedalia, MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Erosion Control Repair
Infrastructure
Bidding
$2,500,000 to $500,000 est. value

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Pavement Improvements and Culvert Replacement
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
MO

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Metal Pipe (CMP and Arch Pipe)
Results
MO

Reported 10/13/2021 12:00 AM
Project Title

HDPE Storm Water Application Pipe

Physical Address View project details and contacts
City, State (County) Columbia, MO   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents