Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

Proposed Water System Improvements 2019
Infrastructure
Bidding
Herrick, IL

Well No. 7 Raw Water Line Replacement
Infrastructure
Bidding
Milford, IL 60953

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Country Club Lift Station Reconstruction
Results
Saint Charles, IL 60174

Public Water Supply - Water Well #10
Infrastructure
Bidding
Newton, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Bidding
Glenview, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Replacement of Vertical Turbine Pump No. 6
Results
Glencoe, IL 60022

Water System Improvements - Well & Well House No. 7
New Construction, Infrastructure
Bidding
Marshall, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Last Updated 02/09/2022 12:35 PM
Project Title

Well 6 Rehab; Motor and Pump Assembly Replacement

Physical Address View project details and contacts
City, State (County) Village of Lakewood, IL   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description Well # 6 was drilled in 2005 to a total depth of I20-feet; I6-inch casing was installed from the surface to 95 feet. With 25 feet Stainless Steel Well Screen # 60 slotted. The static water level was 22 feet from the ground surface, and the well developed 500-gallons per minute from a pumping level of29-feet. The well is located at 10,000 Appleton Lane. Lakewood, IL. The well pump set is original equipment, records indicate a The well pump is a Goulds, Model # 9RCHC, Self lubricating 2 stage, the pump set to 84-feet on 6" steel column pipe .. The pump is driven by a Hitachi 20 HP I 720 RPM 3ph 460 Volt.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents