Similar Projects
Lowell Ponds Park Development - Adams County
Infrastructure
Conception
$1,800,000 CJ est. value
Denver, CO 80221

RFQ - Hermosa AOP Geotechnical Engineering Studies
Term Contract
Conception
$100,000 CJ est. value
Durango, CO 81301

Petrohunter Phase One Reclamation Project
Infrastructure
Bidding
Denver, CO 80202

Mount Shavano SFU - Diversion Structure Removal
Infrastructure
Bidding
$340,000 CJ est. value
Salida, CO 81201

Superior Trail Wayfinding Signage
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Superior, CO 80027

Phase 1 Tree Removal/Stump Grinding
Term Contract
Sub-Bidding
Florence, CO 81226

On-Call Environmental Services
Term Contract
Post-Bid
CO

Cultural Resources Contract Salter Vegetation Management Project Environmental Assessment & Aspen Vegetation Management Project Environmental Assessment RMRI Cultural Survey Upper Class III Cultural
Term Contract
Post-Bid
Dolores, CO

Asbestos Abatement Contractors for Asbestos Abatement at Ortega Middle School
Results
$30,000 to $40,000 est. value
Alamosa, CO 81101

SB267 Replace HVAC System Building 49 and Replace Water Softeners Building 118, CMHIP, Phases 1,2 and 3 - Package 4 Asbestos Abatement
Results
Less than $350,000 est. value
Pueblo, CO 81003

Greenfield Ct & E Mulberry St Multi-Residential
New Construction, Infrastructure - 9,000 SF
Pending Verification
$570,368,800 CJ est. value
Fort Collins, CO 80524

2023 South Englewood Flood Reduction Site B
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Englewood, CO 80113

Crabbe Crawlspace Abatement
Alteration
Post-Bid
$50,000 est. value
Greeley, CO 80639

Replace Plumbing Abate Asbestos Centennial Building
Demolition, Alteration
Results
Denver, CO 80203

Multi-School Upgrade and Potential Partial-School Replacement
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Canon City, CO 81212

Last Updated 07/26/2023 04:32 AM
Project Title

Burke Martin Mine Non-time Critical Removal Action

Physical Address View project details and contacts
City, State (County) Dillon, CO 80435   (Summit County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate - 06/12/23
Owner View project details and contacts
Architect View project details and contacts
Description

AMENDMENT 0002 - 07/21/2023 - THE PURPOSE OF THIS AMENDMENT IS TO REVISE THE PERFORMANCE WORK STATEMENT AND SITE MAP/DRAWINGS TO REFLECT CHANGES MADE TO THE PROJECT. PLEASE CAREFULLY REVIEW THE REVISED DOCUMENTS TO ENSURE YOU UNDERSTAND THE REVISIONS. DUE DATE FOR OFFERS IS NOT EXTENDED. REVISED ATTACHMENTS INCLUDE THE SCHEDULE OF ITEMS, PERFORMANCE WORK STATEMENT AND J.5 FIGURES (5.1-5.4). CAREFULLY REVIEW THESE ATTACHMENTS FOR CHANGES RELEVANT TO YOUR PROPOSAL! Proposals are being solicited by the USDA, Forest Service for the Burke Martin Mine Non-Time Critical Removal Action (Non-TCRA) Project located on the White River National Forest in Summit County, Colorado. The overall scope of this Removal Action is to channel mine effluent away from specific contaminate source areas (waste piles and sediment tailings) and control specific contaminant source areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate persoProposals are being solicited by the USDA, Forest Service for the Burke Martin Mine Non-Time Critical Removal Action (Non-TCRA) Project located on the White River National Forest in Summit County, Colorado. The overall scope of this Removal Action is to channel mine effluent away from specific contaminate source areas (waste piles and sediment tailings) and control specific contaminant source areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate personnel, materials, equipment, and services needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Contractor, Subcontractor, and all employees are required to be certified in accordance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 1910.120(e)(3)(i) 40-Hour course for General Site Worker (HazWOPER). Project Location: The Burke Martin Mine Complex - is situated immediately on the west side of the Snake River approximately 0.6 miles above the Town of Montezuma on Co Rd 5 (Montezuma Road) (SUMMIT COUNTY, CO) The period of performance is estimated to be between July through the end of November. This depends upon the contract award date and favorable site conditions into the late season. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000. The attachment J.8 DWG file is available by request. The file is unable to be uploaded to SAM or sent via email due to the size (60MB). Will arrange file transfer upon request. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.nnel, materials, equipment, and services needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Contractor, Subcontractor, and all employees are required to be certified in accordance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 1910.120(e)(3)(i) 40-Hour course for General Site Worker (HazWOPER). Project Location: The Burke Martin Mine Complex - is situated immediately on the west side of the Snake River approximately 0.6 miles above the Town of Montezuma on Co Rd 5 (Montezuma Road) (SUMMIT COUNTY, CO) The period of performance is estimated to be between July through the end of November. This depends upon the contract award date and favorable site conditions into the late season. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000. The attachment J.8 DWG file is available by request. The file is unable to be uploaded to SAM or sent via email due to the size (60MB). Will arrange file transfer upon request. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: The overall scope of this Removal Action is to channel mine effluent away from specific contaminate source areas (waste piles and sediment tailings) and control specific contaminant source areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate personnel, materials, and services needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing. Subsequent to the conference, an amendment to the solicitation containing an abstract of the questions and answers, and a list of attendees, will be disseminate

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents