Similar Projects
Z--Lowe Rehabilitate Central Street Walkway
Term Contract
Design
$500,000 to $1,000,000 est. value
Lowell, MA 01852

Town Hall Brick Sidewalk Repair
Infrastructure
Bidding
$20,000 est. value
Weston, MA 02493

Superstructure Replacement Beaver Street Over Beaver Brook Bridge (No L-15-055)
New Construction, Infrastructure
Bidding
$3,138,545 est. value
Lowell, MA 01850

Complete Streets Sidewalk Project, Great Road at Old Bolton Road and Harvard Road
Post-Bid
Less than $216,000 est. value
Stow, MA

Everett Northern Strand Community Trail Extension
Post-Bid
$3,535,813 est. value
Everett, MA 02149

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Bridge Replacement BR No (Steel) Fruit Street Over CSX Railroad and the Sudbury River
Results
Less than $12,580,805 est. value
Hopkinton, Westborough, MA 01748

Annual Road and Sidewalk
Term Contract, Infrastructure
Bidding
$1,564,000 est. value
Melrose, MA

Construction of Walkways With Lights
Post-Bid
Hudson, MA

Sidewalk Repairs and Improvements at Various Locations
Results
Less than $1,311,370 est. value

Removal and Replacement of Existing Cement Concrete and Asphalt Sidewalks
Infrastructure
Bidding
$2,473,000 est. value
Wakefield, MA

Concrete Sidewalk Reconstruction and ADA Ramps
Post-Bid
$200,000 est. value
Winchester, MA

Scheduled and Emergency Drawbridge Operation, Repairs and Related Work at Various Locations
Results
Less than $3,300,000 est. value

Main Street Sidewalk Project
Infrastructure
Bidding
$200,000 est. value
Tewksbury, MA 01876

Downtown Hudson Riverwalk Construction
Post-Bid
$250,000 est. value
Hudson, MA

Last Updated 03/16/2022 11:23 AM
Project Title

Bridge Rehabilitation and Related Work BR No S-17-031 (Including Ramps) on a Section of Interstate 93

Physical Address View project details and contacts
City, State (County) Somerville, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $32,076,411
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $132500","100." "27.000","Ea","Tree Protection – Armoring & Pruning","102.511" "200.000","Ft","Tree And Plant Protection Fence","102.521" "125830.000","Sf","Clean And Paint Structural Steel","106.302" "1.000","Ls","Jacking And Shoring - Ramp c","106.881" "1.000","Ls","Jacking And Shoring - Re-3","106.882" "40.000","Ea","Temporary Shoring - Pier Cap","106.883" "40.000","Ea","Temporary Shoring - Beam End","106.884" "160.000","Ft","Pressure Injection Of Cracks","107.855" "1.000","Ls","Girder Straightening","107.961" "1.000","Ls","Rodent Control","119." "1.000","Ls","Construction Noise Control","119.5" "13.000","Cy","Earth Excavation","120." "1200.000","Cy","Deicing Materials Removed And Stacked","120.111" "200.000","Cy","Reinforced Concrete Excavation","127.1" "5.000","Cy","Class b Rock Excavation","144." "1.000","Ls","Public Outreach","149.2" "60.000","Cy","Gravel Borrow","151." "100.000","Hr","Licensed Site Professional Services","180.03" "100.000","Ton","Disposal Of Unregulated Soil","181.11" "100.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "100.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "100.000","Ton","Disposal Of Hazardous Waste","181.14" "260.000","Sy","Pavement Micro Milling","415.3" "1.000","Ls","Construction Dust Control","440.01" "150.000","Ton","Hma For Patching","451." "19.000","Gal","Asphalt Emulsion For Tack Coat","452." "220.000","Ton","Temporary Asphalt Patching","472." "2.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "50.000","Ft","Granite Edging Type Sb - Straight","511.1" "170.000","Ft","Curb Removed And Reset","580." "50.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "1.000","Ea","Trailing Anchorage","627.1" "1.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "2.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Temporary Impact Attenuator, Redirective, Tl-2","628.314" "140.000","Ft","Highway Guard Removed And Discarded","630.2" "150.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.072" "100.000","Ft","Fence Removed And Stacked","669." "45.000","Sy","Cement Concrete Sidewalk","701." "67.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "33.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "2850.000","Ft","1-1/4 Inch Hdpe Innerduct (Triple) Inside Existing And New 4 Inch Conduit","801.11" "290.000","Ft","2 Inch Extra Wall Fiber Reinforced Conduit","804.151" "154.000","Ft","4 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.4" "680.000","Ft","3 Inch Electrical Conduit Ty Rm - Steel - (Plastic Coated)","808.3" "2370.000","Ft","4 Inch Electrical Conduit Ty Rm - Steel - (Plastic Coated)","808.4" "1.000","Ls","Viaduct Fiber Optic Cable Segment","810.31" "500.000","Ft","Conduit Removal","810.321" "2.000","Ea","Electric Handhole Adjusted","811.37" "4.000","Ea","Junction Box 24 x 24 x 10 Inches","811.87" "7.000","Ea","Junction Box 48 x 36 x 12 Inches","811.91" "1.000","Ea","Light Standard Foundation Sd3.011","812.11" "700.000","Ft","Wire Type 7 No. 4 General Purpose","813.33" "700.000","Ft","Wire Type 6 -- #6 Grounding And Bonding","813.522" "290.000","Hr","Field Adjustment Of Existing Traffic Signal Timing","816.1" "110.000","Hr","Traffic Monitoring And Engineering","816.2" "1.000","Ea","Highway Lighting - Underpass Removed And Reset","820.111" "1.000","Ea","Highway Lighting Pole (Anchor Base) 6 Foot Bracket","821.11" "1.000","Ea","Highway Lighting Pole And Luminaire Removed And Stacked","823.71" "1.000","Ls","Modifications To Overhead Guide Sign (Od-3) Steel","840.111" "1.000","Ls","Modifications To Overhead Guide Sign (Od-4) Steel","840.112" "1.000","Ls","Modifications To Overhead Guide Sign (Od-5) Steel","840.113" "540.000","Day","Traffic Cones For Traffic Management","851.1" "2650.000","Sf","Safety Signing For Traffic Management","852." "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "220.000","Ft","Temporary Barrier (Tl-2)","853.2" "1.000","Ls","Truck Mounted Barrier System","853.35" "3330.000","Day","Truck Mounted Attenuator","853.403" "1120.000","Day","Temporary Illumination For Work Zone","853.8" "3290.000","Day","Temporary Portable Rumble Strip","854.6" "4400.000","Day","Arrow Board","856." "1690.000","Day","Portable Changeable Message Sign","856.12" "1.000","Ls","Real-Time Traffic Management Systems For Work Zones","856.3" "277000.000","Day","Reflectorized Drum","859." "4400.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "1.000","Ls","Incident Response Operations Plan","859.25" "2.000","Ea","Traffic Sign Removed And Reset","874.2" "1.000","Ea","Traffic Sign Removed And Stacked","874.4" "300.000","Sf","Temporary Masking Of Signs","874.6" "200.000","Cy","Rapid Setting Concrete (Low Absorption)","904.14" "8270.000","Sf","Concrete Repair - Shallow","909.121" "8930.000","Sf","Concrete Repair - Deep","909.122" "2580.000","Sf","Concrete Repair - Overhead Shallow","909.123" "3310.000","Sf","Concrete Repair - Overhead Deep","909.124" "59870.000","Sf","Chloride Remediation","909.125" "3.000","Ea","End Diaphragm Replacement - Type a","909.127" "301.000","Ea","End Diaphragm Replacement - Type b","909.128" "151.000","Ea","End Diaphragm Replacement - Type c","909.129" "2450.000","Lb","End Diaphragm Replacement - Type d","909.130" "10000.000","Lb","Steel Reinforcement For Structures - Coated","910.2" "2.000","Ea","Laminated Elastomeric Bearing w/o Anchor Bolts (101-150)","922.3" "2.000","Ea","Laminated Elastomeric Bearing w/o Anchor Bolts (>200)","922.5" "110650.000","Lb","Structural Steel - Coated Steel","960.1" "1590.000","Ft","Remove And Replace Existing Deck Joint - Type a","973.001" "960.000","Ft","Remove And Replace Existing Deck Joint - Type b","973.002" "1.000","Ls","Salt Storage Area Remediation","989.22"

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents