Similar Projects
Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Bidding
Atlanta, GA 30303

Buddy Spann Park Well No. 5 (105)
Bidding
Hazlehurst, GA

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Wastewater Flow Measurement Stations
Results
Covington, GA 30016

New 30,000 Gallon Draft Pit
Bidding
Valdosta, GA 31606

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Pond Springs Road Test Well with Production Option
Results
Chickamauga, GA

Bypass Pump Station And Force Main Alternate Route
Bidding
GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

Effluent Pump Station Pump Replacement
Results
Less than $100,000 est. value
Camilla, GA 31730

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Reported 11/24/2020 12:00 AM
Project Title

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement

Physical Address View project details and contacts
City, State (County) Buford, GA 30519   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replacement of Backwash Waste Pumps 34:BWW-P-3 through P-6 and associated adjustable frequency drives, air release valves, check valves, isolation valves, and piping; 2. Replacement of Backwash Waste Transfer Pumps 34:BWW-P-7 and P 8 and associated check valves, air release valves, isolation valves and piping; 3. Reconfiguration of Backwash Waste Pump Station Piping and Instrumentation; 4. Addition of a media containment wall in each Backwash Waste Basin. 5. Modifications at the Equalization Distribution Box; and 6. Installation of electrical duct banks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents