Similar Projects
Home2 Suites by Hilton / Columbia
New Construction, Infrastructure - 50,000 SF
Conception
$27,000,000 CJ est. value
Columbia, MO 65203

Home2 Suites by Hilton / Columbia
New Construction, Infrastructure - 50,000 SF
Conception
$27,000,000 CJ est. value
Columbia, MO 65203

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

General Site - Culvert Under Capen Park Drive Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Columbia, MO 65201

General Site - Culvert Under Capen Park Drive Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Columbia, MO 65201

Milling and Overlay for Columbia Streets - Multi Year
Term Contract
Post-Bid
Columbia, MO

Emulsified Maltene-Based Asphalt Rejuvenating Agent and Sealer
Term Contract
Post-Bid
Columbia, MO

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

O'Reilly Auto Parts (CO5) #6643 / Columbia
New Construction, Infrastructure - 6,972 SF
Construction
$1,300,000 CJ est. value
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Warehouse and Enclosed Equipment Parking - E0176 - 1593 - City of Columbia
New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Columbia, MO 65203

Last Updated 06/28/2023 11:08 AM
Project Title

Culvert Improvement-McGee Rd Culvert

Physical Address View project details and contacts
City, State (County) Columbia, MO 65203   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $181,611 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope is as specified in the Notice to Bidders for this Project. RELATED DOCUMENTS Plans and general provisions of Contract, including General Specifications, Technical Specifications and Special Provisions. The Contractor shall keep at least one set of the plans and specifications available on the site at all times for construction purposes. The Contractor shall keep at least one copy of the Boone County Roadway Regulations Chapter II on site at all times for construction purposes. All questions pertaining to the project must be received by 3:00 p.m. on Thursday, May 18, 2023. Technical questions should be directed to the Project Manager. Excavate and remove the existing single, 7 diameter steel pipe crossing on McGee Rd. Construct bedding pad and install 16Wx7H precast concrete box culvert. Backfill culvert, install rock blankets, construct finished grading, restoration, and construct asphalt road patch.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents