Similar Projects
As Needed Professional Land Surveying Services for the Department of Public Works
Term Contract
Bidding
Long Beach, CA 90802

Water Sampling & Compliance With Directive 1116(2)
Term Contract
Bidding
San Diego, CA 92161

H335--Palo Alto Elevator Inspection Base +4Oy
Term Contract
Post-Bid
Livermore, Menlo Park, Mountain View, Palo Alto, San Jose, CA 94304

H335--Palo Alto Elevator Inspection Base +4Oy
Term Contract
Post-Bid
Livermore, Menlo Park, Mountain View, Palo Alto, San Jose, CA 94304

Construction Management Services for the Marin Center Exhibit Hall Seismic Retrofit Project
Alteration
Results
$1,840,000 est. value
San Rafael, CA

Construction Management Services for Vine St. Mobility Hub
Infrastructure
Results
Riverside, CA 92519

Phoenix Area Facilities Technical Specialist Services
Term Contract
Bidding
Phoenix, AZ - Winterhaven, CA

Pavement Condition Inspection and Index Services
Term Contract
Post-Bid
San Jose, CA

Berkeley High School Classroom Building A Project
Renovation
Results
$1,500,000 est. value
Berkeley, CA 94704

A and E On-Call Specialty Construction Services
Term Contract, Infrastructure
Bidding
$4,656,800 to $7,567,300 est. value
Riverside, San Bernardino, CA

Water Station 4 Facility Assessment
Infrastructure
Post-Bid
Santa Rosa, CA 95405

Tree Inspection Services
Term Contract
Results
Point Reyes Station, CA 94956

On-Call Civil Engineering and Land Surveying Consulting Services
Term Contract
Bidding
San Leandro, CA

Asbestos, Lead And Mold Assessment, Training, And Consultation Services
Term Contract
Post-Bid
San Luis Obispo, CA 93405

Pavement Inspector Pre-Qualification Program
Term Contract
Results
$118,545 est. value
CA

Last Updated 04/04/2022 11:07 AM
Project Title

Snobird Deep Well Maintenance and Inspection

Physical Address View project details and contacts
City, State (County) Livingston, CA   (Merced County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The well work required includes “pulling” the wells (removing motor and using a crane to pull out column pipe, bowls, etc.); evaluate the well, pump, motor, and casing utilizing visual inspection and submersible camera; and providing repairs where needed so that the wells are fully and efficiently functioning without further degradation of the machinery. This work may include and is not limited to replacing the 50 hp pumps, bowls, column pipes, tubes & shafts, bearings, stubs & strainers, and miscellaneous well/pump parts. Labor included for pulling, repairing, and re-installing the pump parts and motors.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents