Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR-23; SR-30 to Idaho Preservation High Volume
Infrastructure
Bidding
$4,000,000 CJ est. value
Cache Jct, UT 84304

Spring Water Metering Vault 2021
Infrastructure
Post-Bid
Providence, UT

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

100 West Corridor Construction
Infrastructure
Results
Logan, UT

Quarter Circle Drive Canal Piping Project 2021
Alteration
Construction
Nibley, UT 84321

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

RFP D/B - Providence City Skate Park
Infrastructure
Bidding
$300,000 CJ est. value
Providence, UT 84332

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

North Valley Landfill Drain Net Installation V2
Infrastructure
Results
$68,020 CJ est. value
Logan, UT 84321

Last Updated 12/06/2022 05:28 AM
Project Title

Lewiston City Sewer System Upgrades

Physical Address View project details and contacts
City, State (County) Lewiston, UT 84320   (Cache County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Civil Engineer - 11/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Lewiston City Sewer System Upgrades consist of installing approximately 9,400 ft of new gravity sewer pipe, installing new treatment system headworks, installing lagoon aeration sys- tem, upgrading chemical disinfection systems, and installing effluent reaeration vault. The project is scheduled to be substantially complete by April 2024.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents