Similar Projects
Unit No. 8 GE FS7E Exhaust Silencer Panel(S) Modifications and Repairs
Bidding
Lakeland, FL 33801

Water Fountain Replacements Citywide
Bidding
Holly Hill, FL

Ground Transportation Facility GMP 8S.1
Sub-Bidding
Orlando, FL 32827

Grizzle Building, Replace Generator, Chiller Pumps, and Air Handling Units
Post-Bid
$2,000,000 est. value
Largo, FL

Annual Control and Safety Valve Repair Services
Term Contract
Post-Bid
Lakeland, FL 33805

46--Water Purification System
Results
West Palm Beach, FL 33410

J--Copy of Service: Visn 8 Boiler Safety Device Testing, Program Development and Training
Results
Bay Pines, Cape Coral, Gainesville, Lake City, Miami, Orlando, Tampa, West Palm Beach, FL - San Juan, PR

Indian River State College Main Campus Chiller Plant Building-X Upgrades Project
Construction
Fort Pierce, FL 34981

Boiler Preventative Maintenance and Repairs
Term Contract
Bidding
FL

Directions for Living
Post-Bid
Clearwater, FL 33764

H--Service: Mechanical Backflow Prevention Evaluation (Cross Connection Survey)
Results
Bay Pines, FL 33744

Maintenance and Repair of Two Cleaver Brooks Steam Boilers
Bidding
Miramar, FL 33027

Navy Point Elementary School Chiller Replacement
Post-Bid
Pensacola, FL 32507

Water Treatment Plant Nano Filtration Membrane Replacement
Results
Hallandale, FL 33009

Commercial Refrigeration Repair Services
Term Contract
Bidding
$250,000 est. value
Bradenton, FL

Last Updated 03/17/2020 08:11 AM
Project Title

Maintenance/Repairs of Two Cleaver Brooks Steam Boilers

Physical Address View project details and contacts
City, State (County) Miramar, FL 33027   (Broward County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Four (4) Quarterly Visits to include the following tasks at a minimum: 1. Blow down boiler, front, and rear drain valve. 2. Check all safety and limit controls. 3. Check gas pressure and gas piping in boiler room. 4. Check flue system, flue dampers, and room combustion air. 5. Check for any soot build up. 6. Check fuses and circuit breakers on boiler control panel. 7. Note any deterioration on boiler or related piping. 8. Water level control valves during blow down. 9. Check the air-fuel ratio and adjust. 10. Clean vent stub. 11. Clean oil strainers. 12. Check boilers for unusual noise, improper gauge reading. 13. Test fire boiler on oil and gas. 14. Check for tightness of connections, lock-nuts, set screws, packing glands, valve actuation. 15. Check burner for evidence of damage due to improperly adjusted combustion. 16. Check seal between burner housing and the oven liner. 17. Inspect fuel cam profile spring lubricate. 18. Inspect gas butterfly valve for proper operation. 19. Inspect Four (4) ASCO Hydramotor Gas Vales Model AH2E112S for proper operation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents