Similar Projects
Mill Town Mixed Use
New Construction
Conception
Chattanooga, TN

Villages of Porter Farms Phase 25
New Construction
Conception
Collierville, TN 38017

Amber Valley Subdivision
New Construction
Design
Chattanooga, TN 37411

Wilson Lake Planned Development Phase I
New Construction
Design
Arlington, TN 38002

Home Rehabilitation
Renovation
Bidding
Memphis, TN

Fire Damaged Dwelling Unit 3 at East Lake Courts
Renovation
Bidding
Chattanooga, TN 37407

Home Housing Rehabilitation
Renovation
Post-Bid
TN

THDA Home Grant Housing Rehabilitation
Renovation
Post-Bid
Sneedville, TN

Home Grant Rehabilitation
Renovation
Results
Bolivar, TN

Rehabilitation of Owner-Occupied Housing Units Throughout Shelby County
Renovation
Results
Memphis, TN 38134

Bainbridge Park Subdivision
New Construction
Construction
Chattanooga, TN

Georgetown Planned Development
New Construction
Construction
Collierville, TN 38017

Waterstone Ridge Phase II
New Construction
Pending Verification
Chattanooga, TN

Hunter's Point Section 7 Housing Development
New Construction
Pending Verification
Spring Hill, TN 37174

Brooks Property Planned Development
New Construction
Conception
Collierville, TN 38017

Reported 12/15/2021 12:00 AM
Project Title

Home Rehabilitation Program Work Order 2022CN0003

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37920   (Knox County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Existing cover plates are laying on top of water heater. Install an Electrical Disconnect and Romex Connection for water heater. All HVAC units shall be installed as specified. Mechanical permits will be required for all HVAC work. All split system Heat pumps installed to be 15 SEER or greater, 8.5 HSPF or greater. All package system Heat pumps installed to be 15.0 SEER or greater, 8.2 HSPF or greater. All heating & cooling equipment must be energy star equivalent and shall be sized according to the latest editions of ACCA Manuals J and S. Specification of any type of unit shall be taken to include all connections to existing wiring terminations, connecting to existing ducting and line sets and any safety switches, condensate pumps. Asphalt Shingles - Replacement: Apply 15# felt underlayment, (or synthetic felt underlayment) and 225# self-sealing, 25-year shingles. Install all roof material as specified by the manufacturer. Shingles applied to low sloped roofs (less than 4/12 pitch) must have ice and water shield applied under all the shingles and have no more than 3" shingle tab exposure. Use ice and water shield by TAMPKO and follow manufacturer's directions to install.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents