Similar Projects
Sherman Hospital
New Construction
Conception
$150,000,000 est. value
Sherman, TX 75092

New State Psychiatric Hospital
New Construction
Conception
$45,000,000 est. value
Austin, TX

TCH West Campus Chillers
Renovation - 640 SF
Design
Houston, TX 77094

HCA Houston Healthcare Expansion
Renovation
Design
Houston, TX 77004

Renovation of the Emergency Center at Lyndon B Johnson Hospital
Renovation
Bidding
$2,600,000 est. value
Houston, TX 77026

Springstone McKinney Hospital
New Construction - 58,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
McKinney, TX 75071

Renovate Alkek Hospital, Main Building, Floor 12
Renovation
Post-Bid
Less than $7,100,000 est. value
Houston, TX

Renovation and Expansion of the Casa De Amigo Clinic
Renovation - 23,000 SF
Post-Bid
Houston, TX 77009

PET CT and NUC MED Suite Renovation
Renovation, Addition
Results
Houston, TX

Y--Reconfigure 2J Basement Floor for IT & Administration Space (VA-19-00046746)
Renovation
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Surgery Center of North Texas
New Construction - 23,000 SF
Construction
$7,500,000 est. value
Anna, TX 75409

Construction of South Access Control Point for Fort Bliss Replacement Hospital
New Construction
Construction
$10,000,000 to $25,000,000 est. value
El Paso, TX

UT MDACC Research Medical Library Building B
Renovation - 7,930 SF
Pending Verification
Houston, TX 77030

UT MDACC Research Medical Library Relocation Building A
Renovation - 12,500 SF
Pending Verification
Houston, TX 77054

Methodist Mansfield Medical Center Emergency Department
Renovation - 1,800 SF
Design
$350,000 est. value
Mansfield, TX 76063

Reported 01/31/2022 10:00 AM
Project Title

Building Renovations at NTSH Wichita Falls Campus

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76308   (Wichita County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method
Project Status Construction Commenced fourth quarter 2021
Bids Due View project details and contacts
Estimated Value $3,144,441
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ceiling hardening and patient safety provisions in Patient Sleeping and Common Areas to eliminate ligature and injury risks with replacement of sprinkler heads to Raven institutional type, installation of tamper resistant light fixtures, diffusers and grilles, and life safety devices, replacement of doors and door hardware, and modifications in toilet rooms and showers for phased work using swing space in Buildings 518, 521, and 683, replacement of doors and hardware in Patient Common Areas in Buildings 510 and 511, electronic access controls in Administrative Buildings 504, 505, 509, 703, and 707, and replacement of Sprinkler system in Building 695 Warehouse. Additive Alternates include acoustic rubber flooring and acoustic wall panels in Patient Sleeping and Common Areas in Buildings 510, 511, 518, 521, and 683.

Details

Hospital, Renovation.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 08 - Openings.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents