Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Escalante Municipal Watershed Lop and Pile
Infrastructure
Bidding
Salt Lake City, UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Construction of the 400 East Storm Drain Rehab Phase 1
Post-Bid
Saint George, UT 84770

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Remove and Replace Approximately 110` of 14" Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Arch Hydroseeding - Salt Wash Soil Stabilization and Revegetation
Results
Moab, UT 84532

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Trail Mountain Emergency Watershed Protection
Results
Castle Dale, UT 84513

The East Bay Golf Course Pond Banks Renewal Project
Post-Bid
Provo, UT 84606

Last Updated 08/26/2021 08:32 AM
Project Title

DFCM Construction - Pre Qualified General - UDOT Tooele County Maintenance Stations

Physical Address View project details and contacts
City, State (County) Grantsville, Tooele, Wendover, UT 84029   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $312,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DFCM Construction - Pre Qualified General - UDOT Tooele County (Tooele, Grantsville and Wendover) Maintenance Stations Sander Rack and Drain Improvements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents