Similar Projects
Kitchen Fire Suppression Maintenance
Term Contract
Bidding
San Antonio, TX

AFTF Maintenance and Inspections
Post-Bid
Randolph, San Antonio, TX

JBSA Fort-Sam Houston Fire Suppression Maintenance
Post-Bid
San Antonio, TX 78245

Electrical, Fire Alarm, Lighting and MDF/IDF Upgrades at H.B. Zachry Middle School
Results
San Antonio, TX 78250

Clock System, Fire Alarm and Lighting Upgrades at Glenoaks Elementary School, Scobee Elementary School and Holmgreen Center
Results
San Antonio, TX 78229

JBSA Hangar Fire Suppression Systems Maintenance
Post-Bid
San Antonio, TX

Fire Alarm and Sprinkler Services
Results
Less than $50,000 est. value
San Antonio, TX 78756

Annual Contract for Fire Alarm Systems Inspections, Maintenance, and Repair Service - BESD and Parks
Term Contract
Post-Bid
San Antonio, TX 78283

Fire Sprinkler and Mdf/Idf Replacement at Lloyd M. Knowlton ES
Results
San Antonio, TX 78245

Lighting, Mechanical and Fire Alarm Upgrades at Various Campuses
Post-Bid
Less than $397,000 est. value
San Antonio, TX 78250

Fire Alarm System Monitoring, Inspection and Maintenance at SASH
Term Contract
Results
San Antonio, TX 78223

Lackland & Randolph AFB Fire Suppression Systems Maintenance Services
Post-Bid
Randolph, TX

Fire Sprinkler Inspection and Maintenance at San Antonio State Hospital
Term Contract
Results
San Antonio, TX 78223

Job Order Contract (JOC) for as Needed Fire and Security Alarm, Indoor Sprinkler, and Technical Building Systems Repairs and Renovations
Renovation
Results
$500,000 est. value
San Antonio, TX 78200

JBSA Hangar Fire Suppression Maintenance
Results
TX

Last Updated 12/11/2020 02:38 PM
Project Title

Water-Based Fire Protection System Test and Inspect

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Test and Inspections performed by the Contractor for the Fire Protection Systems listed on Line Item section in ESM Solutions as per specifications contained herein shall include but are not limited tthe following: Fire Hydrant Test and Inspection. Inquire as tthe changes in general occupancy environment, operations and conditions related tthe water-based fire protection systems. Inspect for any changes or modifications tthe water-based fire protection systems. Test riser alarm devices; report any problems. Test main drain; report any problems. Inspect gauges. Inspect valves for appropriate position, accessibility and tensure they are free of leaks. Determine if any heads are more than fifty (50) years old; report all that are more than fifty (50) years old. Determine if all areas of the wet systems are heated; report any areas that are not heated. Inspect hangers and supports, sprinkler heads and piping; report any problems. Inspect for spare sprinkler heads and proper sprinkler wrench(es); replace as needed. Inspect Fire Department connections; report any problems. Test fire pump operation under flow condition; report results of test. 5-Year Internal Inspection if none on file. 2. Inspections shall be performed in accordance with NFPA 25 and meet all state and local government codes and amendments. 3. Bidder shall submit sample reports in hard copy with their Bid response. 4. Electronics shall be coordinated thru the Foreman or Operations Manager of the NISD Maintenance Plumbing Department. 5. Scheduling of all inspection shall be made in accordance with District policy tminimize any disruption of facility operations, curriculum or activities. All scheduling shall be coordinated in advance with the facility or campus administrator or plant manager and the Maintenance Electronics Foreman or Manager. Work hours shall be 7:00 AM t3:00 PM Monday through Friday during non-instructional days (when school is not in session). Work hours shall be after 3:00 PM for Elementary schools, after 3:45 PM for Middle schools and after 4:30 for High schools during instruction days (when school is in session). Approximately ninety-five (95) percent of the Test and Inspection process will be scheduled during non-instructional days. 6. When testing and inspection of the water-based fire protection systems reveal defective parts or functions that could cause impairment of proper operation of the system, the Contractor shall notify the Foreman or Operations Manager of the Maintenance Electronics Department while still on site. Contractor shall prepare a detailed proposal describing the services and/or equipment required for needed repairs within one week of discovery. The proposal shall be submitted electronically tthe Foreman and Operations Manager of the Maintenance Electronics Department. NISD will then submit tmultiple pre-Qualified Vendors a request for quote tperform the needed repairs. 7. Bid for cost of individual Test & Inspection shall include cost of re-inspection if needed.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents