Similar Projects
Pavement Reclamation, Resurfacing and Aggregate Should Improvements on Anderson Road From IL 64 to IL 38
Infrastructure
Bidding
$4,000,000 est. value
Campton Hills, IL

Bliss/Main/Fabyan Intersection Realignment
Infrastructure, Alteration
Bidding
$220,000 est. value
Geneva, IL 60134

Central Division - Asphalt Paving Maintenance
Post-Bid

Site Paving
Post-Bid
Elgin, IL 60120

(1.937-Mile) Improvement Consists of Crack Cleaning and Sealing in the Existing Concrete Pavement Between Traffic Lanes, Curb and Gutter, Restriping Pavement Marking
Results
IL

Bolz Road Reconstruction from Amarillo Drive to Kennedy Drive
Results
Carpentersville, IL 60110

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Roundabout Construction and Roadway Realignment
Infrastructure
Bidding
$200,000 est. value
Campton Hills, IL

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

National Tool Driveway
Results
Less than $261,459 est. value
East Dundee, IL

Resurfacing Project Between Raymond Street and National Street
Infrastructure
Bidding
$339,000 est. value
Elgin, IL 60120

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2022 Elgin Township Resurfacing
Infrastructure
Bidding
IL

2021 Street Program
Post-Bid
Elburn, IL

Reported 04/29/2022 12:00 AM
Project Title

2022 Street Program

Physical Address View project details and contacts
City, State (County) Elburn, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

his Project Consists of Removal and Disposal of Unsuitable Materials (700 Cy), Hma Surface Removal (Butt Joint) (638 Sy), Hma Binder Course Il-19.0, N50 (3,500 Ton), Hma Surface Course, Mix "D", N50 (2,350 Ton), Hma Surface Removal (27,000 Sy), Partial Depth Patching (800 Sy), Sidewalk Removal (6,800 Sf), Pcc Sidewalk 5 Inch (Special) (7,400 Sf), Detectable Warnings (180 Sf), Comb. Conc. Curb and Gutter Removal and Replacement (4,100 Ft), Comb. Conc. Curb and Gutter, Special (285 Ft), Structures to Be Adjusted (38 Ea), Restoration (1900 Sy), Crack Routing (Pvmt) (32,000 Ft), Crack Filling (10,600 Lb), Class D Patches, 4 Inch (60 Sy), Paint Pvmt Mkgs - Let & Sym (770 Sf), Paint Pvmt Mkgs - Line 4" (21,400 Ft), Paint Pvmt Mkgs - Line 6" (4,100 Ft), Paint Pvmt Mkgs - Line 8" (75 Ft), Paint Pvmt Mkgs - Line 12" (1,100 Ft), Paint Pvmt Mkgs - Line 24" (170 Ft), and Traffic Control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents