Similar Projects
Elizabeth Street Life Sciences Lab
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Chicago, IL 60642

Locks 27 Miter Gate Anchorages Replacement
Renovation, Alteration
Design
$1,000,000 to $5,000,000 est. value
Granite City, IL 62040

PIP-II Site Work
Post-Bid
Batavia, IL

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

DNR-Matthiessen State Park Leach Field Replacement
Results
Oglesby, IL

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Tuscany Station Mixed Use
New Construction
Construction
Oswego, IL 60543

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Weatherization 100 Year Floodplain Project
New Construction
Post-Bid
Granite City, Madison, IL 62040

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

Partial Site Development
Post-Bid
Lombard, IL 60148

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Results
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Petnet - Sitework
Alteration
Construction
Elk Grove Village, IL 60007

10500 Grand Avenue Redevelopment
Post-Bid
Franklin Park, IL 60131

Last Updated 08/31/2022 09:33 AM
Project Title

[Rebid] Pinckneyville Lake Dam Spillway Repairs - 2022

Physical Address View project details and contacts
City, State (County) Pinckneyville, IL 62274   (Perry County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Controlled Low-Strength Material (CLSM) and/or Structural Concrete under the slab and walls to stabilize the Spillway from undermining, including all material and equipment required to complete the project All questions shall be directed to Larry D. Gowler, Jr. at HMG Engineers, Inc. at 618-526-9611 or lgowler@hmgengineers.com. The plans show emergency repair of undermining of the spillway crest and chute. All other conditions for Permit 20380 remain in force

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents