Similar Projects
HMA Surface Removal
Post-Bid
Wood Dale, IL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Alley Reconstruction - Section D
Post-Bid
Westmont, IL

2021 Paving
Results
Clarendon Hills, IL

2021 Road Construction Season
Infrastructure
Post-Bid
Lisle, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Traffic Control, Pavement Striping, Tree Removal, HMA Paving
Term Contract
Post-Bid
Villa Park, IL

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

Maple Area Improvements
Infrastructure
Post-Bid
Villa Park, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

2021 Roads Program (GM)
Infrastructure
Post-Bid
Bloomingdale, IL

2021 Sidewalk and Curb Maintenance Program
Results
Naperville, IL

Last Updated 10/12/2022 12:07 AM
Project Title

Washington Street Sewer Separation - Phase 1

Physical Address View project details and contacts
City, State (County) Villa Park, IL 60181   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,448,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of installing approximately 2,700 linear feet of storm sewer varying in size from 12" to 54". The project also includes ductile iron water main installation, sanitary sewer installation, pavement removal, aggregate base course, Hot-Mix Asphalt Binder Course, Hot-Mix Asphalt Surface Course, curb and gutter removal and replacement, sidewalk removal and replacement, driveway pavement removal and replacement, sanitary service installation, water service installation, earth excavation and landscape restoration. Pre-Qualification: Yes

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents