Similar Projects
Split System Air Conditioning Units
Post-Bid
Huntsville, TX

Air Handling Units
Post-Bid
Huntsville, TX 77342

Service to Replace Existing Deaerator and Surge Tank System with New System
Results
Less than $310,586 est. value
Huntsville, TX 77340

Air Conditioning and Air Cooled Condensing Units
Results
Less than $448,350 est. value
Huntsville, TX 77342

Installation of HVAC System Electrical and Spray Foam Insulation
Post-Bid
Huntsville, TX 77340

Multi-Zone Packaged Air Cooled Rooftop Unit
Results
Less than $156,870 est. value
Huntsville, TX 77340

HVAC Parts, Supplies, Services
Term Contract
Post-Bid
Huntsville, TX 77340

HVAC Replacement for Raven Village
Results
Less than $388,200 est. value
Huntsville, TX 77340

Replace Heat Exchanger at the Huntsville Unit
Post-Bid
Huntsville, TX 77340

HVAC Repalcement for Raven Village Apartments
Results
Huntsville, TX 77340

HVAC and Mechanical Products
Term Contract
Post-Bid

Split System Air Conditioning and Cooling Air Rotation Units
Results
Less than $443,808 est. value
Huntsville, TX 77342

East Plant Automation Upgrades
Post-Bid
Huntsville, TX

Stringfellow Air Gas Fired Furnace
Results
Less than $27,260 est. value
Huntsville, TX 77342

HVAC Services
Term Contract
Post-Bid
Huntsville, TX

Reported 03/31/2020 12:00 AM
Project Title

Replace Air Handlers - E Building

Physical Address View project details and contacts
City, State (County) Huntsville, TX 75862   (Walker County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. This project consists of converting two existing Daikin Model RAH077CYA heat only air handlers to 0-100% return air in lieu of the 0-30% return air setup which was installed when these units were replaced recently. The previous contractor mistakenly installed the units without return air fans. 2. The current work includes: a) Supply and install (2) 30 HP plug type return air fans. Each return air fan shall move 27,800 cfm with a total static pressure of 3.0 in. wc. b) Cut a 38” x72” opening in the side of the return air plenum of both units to allow for the relief air to reach the relief air duct on the end of the building. c) Cut the necessary hole in the floor of the return air section to install an automatic return air damper in the floor of the return fan section to communicate with the return air plenum sized for a maximum airflow speed of 1500 fpm. d) Supply and install an automatic relief air damper in the relief air duct to allow for relief exhaust. e) Supply and install the electrical controls, Variable Frequency Drives for the return air fan blower motors, and any other necessary electrical wiring or accessories to facilitate the added return air fans. f) The unit controls shall be set up to allow 0-100% outside air when the modifications are complete. See the attached original air handler plans for reference.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents