Similar Projects
Playground Installation
Infrastructure
Bidding
$952,000 CJ est. value
Henrieville, UT 84736

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

DFCM Construction Multi Step Const-escalante State Park Day Use and Campground Improvements
Infrastructure
Results
$4,695,370 CJ est. value
Escalante, UT 84726

Garfield County Airport Road Bridge, Concrete Bridge Deck Project 2022
Infrastructure
Results
$600,000 CJ est. value
Panguitch, UT 84759

Re-Stripe Park Roads, Centerline and Fog Lines
Infrastructure
Post-Bid
$100,000 CJ est. value
Bryce Canyon City, UT 84764

Redevelopment of John Allen Bottom Spring 4
Infrastructure
Results
$67,852 CJ est. value
Escalante, UT 84726

DFCM Construction Multi Step Const-escalante State Park Day Use and Campground Improvements
Infrastructure
Post-Bid
$4,600,000 CJ est. value
Escalante, UT 84726

Antimony Town Well Project - Well Drilling
Infrastructure
Post-Bid
$360,000 CJ est. value
Antimony, UT 84712

Replacement of 2-inch Diameter Water Line
Infrastructure
Post-Bid
$123,280 CJ est. value
Escalante, UT 84726

Guzzler Fifty Mile Bench
Infrastructure
Post-Bid
$240,000 CJ est. value
Escalante, UT 84726

SR-143; Slope Stabilization and Flood Repair Drainage
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Panguitch, UT 84759

Fiber, Wilson Peak to Garfield County Sherrifs Office
Infrastructure
Post-Bid
$490,000 CJ est. value
Panguitch, UT 84759

Garfield Memorial Hospital - OR, CP, and Pharmacy
Addition, Demolition, New Construction, Infrastructure - 3,473 SF
Post-Bid
$3,000,000 CJ est. value
Panguitch, UT 84759

Last Updated 05/12/2023 07:33 PM
Project Title

Mammoth Creek Hatchery Building by-pass

Physical Address View project details and contacts
City, State (County) Hatch, UT 84735   (Garfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of constructing a pipeline and concrete trough to separate fish waste water from fish clean water- waste water to tie into an existing waste system and clean water to tie into lower fish raceways for continued use. Construction Cost Estimate: $260,000.00 Question Submission Close Date 5/9/2023 3:00 PM MDT

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents