Similar Projects
CR - Bridge Replacement
New Construction
Bidding
$663,914 est. value
TX

Northern Walnut Creek Hike and Bike Trail Phase 2
New Construction, Infrastructure
Bidding
$4,500,000 est. value
Austin, TX 78750

Bridge
Post-Bid
Gatesville, TX 76528

Installation of Thrie-Beam Retrofit Rail
New Construction
Post-Bid
College Station, TX

Replace Bridge and approaches
Results
Less than $1,337,281 est. value
TX

Replace Bridges and Approaches
Results
Less than $1,419,845 est. value
TX

CS - Rehabilitate Bridge
New Construction
Bidding
$467,420 est. value
TX

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Replace Bridges and Approaches
Results
Less than $1,406,637 est. value
TX

CS-Replace Bridge And Approaches
New Construction, Infrastructure
Bidding
$526,882 est. value
TX

Construction of Bridge Deck Repair
Results
Less than $6,296,940 est. value
TX

Itasca Road Bridge South Abutment Improvements
Results
$70,000 est. value
Hillsboro, TX 76645

Bear Creek Road West Bridge
Results
Weatherford, TX 76086

Replace Bridge and Approaches
Results
Less than $377,833 est. value
TX

Bridge
Results
Less than $754,219 est. value
TX

Last Updated 07/01/2021 07:41 AM
Project Title

Great Oaks Drive Improvements at Brushy Creek Road

Physical Address View project details and contacts
City, State (County) Georgetown, TX   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking qualified contractors for the replacement of the existing Great Oaks Drive bridge and improvements to the Great Oaks Drive/Brushy Creek Road/ Hairy Man Road intersection. Improvements include construction of raised and widened roadways, channel improvements, drainage structures, grading, retaining walls, guardrail, new signals and illumination, additional sidewalks and trails for pedestrians, additional parking capacity, and wastewater line and manhole adjustments. Estimated time of completion is 585 calendar days to substantial completion, and 615 calendar days to final completion, with an estimated cost of $11,900,000.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents