Similar Projects
Reported | 09/17/2020 12:00 AM |
Project Title | Repair Submersible Pump |
Physical Address | View project details and contacts |
City, State (County) | Florence, SC 2906 (Florence County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. The City will remove the pump from the Lift Station 2. The winning bidder shall pick up the pump from the City’s Wastewater Treatment Plant located at 1000 Stockade Road, Florence, SC 2906 3. Once the pump has been repaired, the winning bidder shall return the pump to the City’s Wastewater Treatment Plant located at 1000 Stockade Road, Florence, SC 2906 4. Repair one KSB 110 HP Pump, to include but limited to 1. Disassemble and Assemble 2. Rewind Stator 3. Replace Bearings 4. Replace Mechanical Seals 5. Replace Control Cable 6. Replace Impeller & Wear Rings 7. Replace Gaskets, O-Rings and Oil Seals 8. Repair Keyways 9. Clean, Paint and Test 5. Pump Specification 1. 1,785 RPM 2. 460V 3. Model KRKT 150-401/784XG |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |