Similar Projects
Asphalt Patch Repair, Concrete Curb, and Sidewalk Replacement
Infrastructure
Bidding
Augusta, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

2021 Countywide Unit Price Contract
Term Contract
Post-Bid
Marietta, GA

Repair and Resurfacing of Exercise Walking Track
Infrastructure
Post-Bid
Harrison, GA 31035

TSPLOST Paving Improvement
Results
Thomaston, GA 280149

Roadway Improvements Planation Point Phase II
Results
Woodbine, GA 31569

Action Pact - Charlton County HS Paving Project
Term Contract
Post-Bid
Folkston, GA 31537

Leveling and Resurfacing improvements to College Street and Clements Street
Results
Less than $44,000 est. value
Sumner, GA

2022 LMIG Program
Infrastructure
Post-Bid
Stockbridge, GA

Main Street Drainage Improvement
Results
Woodstock, GA 30188

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

J D Herndon Road Box Culvert
Results
Moultrie, GA

2022 Full Depth Reclamation and Plant Mix Resurfacing on Various Sub-division Streets and County Roads
Infrastructure
Post-Bid
GA

Widening and Reconstruction for Turn Lanes on SR 120 (Roswell Rd) at Robinson Rd ( Cr 1327) and Indian Hills Pkwy (CR 1500)
Results
GA

Repaving at Middle School
Infrastructure
Post-Bid
Eastman, GA 31023

Last Updated 03/29/2022 09:37 AM
Project Title

2022 LMIG Resurfacing Project

Physical Address View project details and contacts
City, State (County) GA   (Emanuel County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,133,147
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the resurfacing of Wadley Coleman Lake RD for 3.4 miles from US HWY 1 to McGarrh Mill Pond Road, Old Keys Mill Pond Road for 5.0 miles from US HWY 80 to GA SR 221, Old HWY 57 (NON GDOT) from the US HWY 1 Bypass for 0.48 miles towards the Swainsboro City Limits, and full lane width deep patching of Griffin Ferry Road at various locations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents