Similar Projects
Westside WWTP Sludge Dewatering Equipment
Alteration
Bidding
High Point, NC

Wastewater Transmission System Improvements - Contract 1
New Construction
Bidding
Pittsboro, NC 27312

Water Reclamation Facility Expansion Project Clarifiers Work
Renovation
Sub-Bidding
Clayton, NC 27520

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

WWTP Improvements Contract I
Post-Bid
Mount Olive, NC 28365

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

210 Wastewater Treatment Facility
New Construction
Bidding
$50,000,000 est. value
Smithfield, NC 27577

Triangle Wastewater Treatment Plant Emergency and Scheduled Treatment Plant Repairs
Post-Bid
Durham, NC

Sugar Creek WWTP Maintenance Building
Results
Charlotte, NC 28210

Muddy Creek Minor Plant Improvements Phase 1
Renovation
Bidding
Winston-Salem, NC 27127

Elizabeth City Raw Water Reservoir and WTP Upgrades
Renovation
Post-Bid
Less than $1,300,000 est. value
Elizabeth City, NC 27906

Big Buffalo Water Reclamation Facility Flood Rehabilitation Project
Results
Less than $4,500,000 est. value
Sanford, NC 27330

Intermediate Clarifier Rehabilitation
Renovation
Bidding
Asheville, NC

Mallard Creek WRF Phase 1 Improvements Construction Manager at Risk Services
Post-Bid
$89,200,000 est. value
Charlotte, NC

Last Updated 10/04/2021 10:19 AM
Project Title

Contract II - Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Mount Olive, NC 28365   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Mount Olive WWTP Improvements - Contract II project will consist of upgrades to the existing influent pump station (increase in pump station capacity) and force main, headworks, oxidation ditches, one RAS/ WAS pump station, the automatic backwash tertiary sand filters, and the aerobic digesters. The existing irrigation pump station will also be upgraded and a new transfer pump station will be constructed. A new effluent Parshall flume structure will be installed for measuring discharge to the Northeast Cape Fear River. A new storage building shall be installed at the WWTP. A vacuum truck dump station will be added to the WWTP site. Lastly, various miscellaneous yard pipes will be rerouted as necessary to accommodate the above improvements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents