Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

Expansion and Upgrading of the Existing Electrical Substation
Infrastructure
Bidding
$340,000 CJ est. value
Camano Island, WA 98282

Expansion and Upgrading of the Existing Electrical Substation
Infrastructure
Bidding
$340,000 CJ est. value
Camano Island, WA 98282

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

Deer Lake Access Redevelopment - Rebid
Infrastructure
Results
$91,766 CJ est. value
Clinton, WA 98236

Deer Lake Access Redevelopment & Lake Cavanaugh Asphalt Paving, Pile Driving & Float Installation
Infrastructure
Results
$247,955 CJ est. value
Clinton, WA 98236

SR 20 / W Fakkema Road - Intersection Improvements
Infrastructure
Design
$804,000 CJ est. value
Ault Field, WA 98277

Bonnie View Acres Road South Outfall
Infrastructure
Bidding
$155,000 CJ est. value
Oak Harbor, WA 98277

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Sanitary Sewer Rehabilitation Project (Pipe-bursting)
Infrastructure
Results
$519,139 CJ est. value
Oak Harbor, WA 98277

Small Works Roster
Term Contract
Design
Camano Island, WA 98282

East Cranberry Lake Dock Replacement at Deception Pass State Park
Infrastructure
Post-Bid
$850,000 CJ est. value
Oak Harbor, WA 98277

Ault Field Road/Goldie Road Traffic Signal Improvements
Infrastructure
Results
$1,306,464 CJ est. value
Oak Harbor, WA 98277

Last Updated 07/25/2023 03:13 PM
Project Title

Improvement of a Drainage System

Physical Address View project details and contacts
City, State (County) Coupeville, WA 98239   (Island County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $155,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the improvement of a drainage system near Bonnie View Acres Road by installing a storm sewer and outfall system and other work, all in accordance with the Contract Plans, Contract Provisions, and the 2023 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project is estimated to cost in the range of $123,000.00 - $155,000.00 . This project lies within a bald eagle nest sensitive area and the Contractor shall complete all work between September 1, 2023 and October 15, 2023. No work activities shall take place from October 16, 2023 through August 31, 2024. Island County reserves the right to reject any or all bids and to waive all informalities in the bidding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents