Similar Projects
Electrical Service Maintenance and Repair
Term Contract
Post-Bid
Syracuse, NY

Electrical Switchgear Maintenance
Term Contract
Post-Bid
Syracuse, NY

Z--528A7-14-715 Renovate Secondary Electrical Distribution
Results
$2,000,000 to $5,000,000 est. value
Syracuse, NY

Z--528A7-18-708 Replace Obsolete Panelboards
Results
$250,000 to $500,000 est. value
Syracuse, NY

2020 Electrical Maintenance and Emergency Repair Contract
Post-Bid
East Syracuse, NY 13057

MRI Lighting Replacement
Results
Syracuse, NY 13210

Furnish Uninterruptible Power Supply (UPS) Package As Specified
Term Contract
Post-Bid
Syracuse, NY 13202

Job Order Contracting - Area 7
Results
$500,000 to $1,000,000 est. value

Edinger Drive Water Tank Solar Power Supply
Post-Bid
Less than $100,000 est. value
East Syracuse, NY 13057

ERF Switchgear/Switchyard Maintenance
Results
Syracuse, NY 13202

Large Scale Renewables
Post-Bid

Furnish Power Systems Enhancement
Results
Syracuse, NY 13202

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

LED Lights
Results
Albany, Buffalo, Syracuse, NY

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

Reported 09/02/2021 11:10 AM
Project Title

Emergency Generators Controls Retrofit

Physical Address View project details and contacts
City, State (County) Baldwinsville, NY 13027   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish BSK Emergency Generators Controls Retrofit as Specified. Complete refurbish of electrical/electronic and fuel related controls for two (2) Onan 750 DKZ generators. Generator model numbers 750-ODFZ-4XR/20092C S/N 780367586 and 780367587 1.Install new control panel 2.Install new voltage regulator 3.Install new wiring harnesses -(Regulators Harness Custom Built. For wall mounting of panels) 4.Install new governor control system and upgrade P> T. system to electronic EFC 5.Fuel System PT Pump and control 6.Install and Start up 7.4 hour 100% Load Test. Components required to upgrade the engine/generator controls. This does not include custom parts and programing that is needed. Onan 750 750 DKZ Generators, 1) Cummings 3062322 speed controller. 2) Cummings 3063683 wiring harness. 3) Cummings A040H852 power command upgrade kit. 4) Cummings 338-3202 wiring harness. 5) Cummings 300-4613 interconnection box. 6) Cummings 300-4622-07 wiring harness. 7) Cummings 3279629 fuel injection pump. 8) Cummings 300-4632 engine control board. 9) Cummings A040N964 control kit. Each generator needs to be tested after completion of the upgrade for approximately four hours underload. There maybe some custom work and parts involving wiring ,running new conduit ,and programming of controllers.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents